Berliner Boersenzeitung - All systems go for Artemis 1 mission to Moon

EUR -
AED 4.210618
AFN 73.378016
ALL 94.569878
AMD 421.465916
ANG 2.052746
AOA 1052.512333
ARS 1663.642959
AUD 1.634988
AWG 2.066615
AZN 1.917679
BAM 1.955642
BBD 2.308513
BDT 140.688622
BGN 1.938641
BHD 0.432254
BIF 3417.823599
BMD 1.146527
BND 1.47978
BOB 7.920394
BRL 5.920786
BSD 1.146207
BTN 108.048435
BWP 15.576333
BYN 3.184742
BYR 22471.934685
BZD 2.305124
CAD 1.622611
CDF 2637.012921
CHF 0.924881
CLF 0.026218
CLP 1031.622112
CNY 7.761191
CNH 7.783831
COP 3951.460409
CRC 519.957951
CUC 1.146527
CUP 30.382973
CVE 110.257045
CZK 24.227555
DJF 204.104384
DKK 7.474786
DOP 66.994582
DZD 153.043079
EGP 57.234527
ERN 17.197909
ETB 181.41802
FJD 2.575387
FKP 0.866674
GBP 0.86654
GEL 3.044059
GGP 0.866674
GHS 12.837018
GIP 0.866674
GMD 83.125684
GNF 10041.187965
GTQ 8.743293
GYD 239.761656
HKD 8.987358
HNL 30.66052
HRK 7.536927
HTG 149.717892
HUF 352.73943
IDR 20416.383251
ILS 3.396705
IMP 0.866674
INR 108.197607
IQD 1501.478575
IRR 1576761.641307
ISK 143.85439
JEP 0.866674
JMD 181.105354
JOD 0.812861
JPY 184.870683
KES 148.418068
KGS 100.264126
KHR 4596.508006
KMF 494.153364
KPW 1031.874953
KRW 1754.611072
KWD 0.353142
KYD 0.955098
KZT 559.34013
LAK 25313.063312
LBP 102638.847161
LKR 382.529065
LRD 208.60313
LSL 18.900572
LTL 3.385397
LVL 0.693523
LYD 7.310409
MAD 10.678836
MDL 20.240833
MGA 4825.630794
MKD 61.660668
MMK 2407.160628
MNT 4104.078481
MOP 9.253552
MRU 45.743301
MUR 54.884428
MVR 17.658804
MWK 1987.447941
MXN 19.882365
MYR 4.743417
MZN 73.274677
NAD 18.900572
NGN 1564.620224
NIO 42.176589
NOK 11.105841
NPR 172.882019
NZD 1.996895
OMR 0.440841
PAB 1.146212
PEN 3.878786
PGK 5.023594
PHP 69.63491
PKR 318.832316
PLN 4.261757
PYG 7038.492184
QAR 4.178299
RON 5.239859
RSD 117.41198
RUB 83.891655
RWF 1679.020284
SAR 4.298324
SBD 9.239056
SCR 15.647396
SDG 688.488856
SEK 10.97347
SGD 1.48031
SHP 0.855998
SLE 28.376814
SLL 24042.107996
SOS 655.047026
SRD 42.844614
STD 23730.799864
STN 24.498019
SVC 10.029189
SYP 126.728065
SZL 18.895472
THB 37.680622
TJS 10.630687
TMT 4.012845
TND 3.386926
TOP 2.760563
TRY 53.250915
TTD 7.772405
TWD 36.242074
TZS 3009.667324
UAH 51.490236
UGX 4171.662636
USD 1.146527
UYU 45.826294
UZS 13810.883108
VES 695.520894
VND 30176.598006
VUV 136.03008
WST 3.155018
XAF 655.903957
XAG 0.017705
XAU 0.000276
XCD 3.098547
XCG 2.065633
XDR 0.806808
XOF 655.909677
XPF 119.331742
YER 271.870251
ZAR 18.891562
ZMK 10320.117783
ZMW 20.545428
ZWL 369.181316
  • CMSD

    0.0000

    22.29

    0%

  • JRI

    0.0500

    12.67

    +0.39%

  • CMSC

    0.0500

    22.37

    +0.22%

  • RBGPF

    -0.5300

    60.61

    -0.87%

  • NGG

    -1.2400

    79.44

    -1.56%

  • BCC

    3.8500

    74.66

    +5.16%

  • RELX

    -0.8300

    31.18

    -2.66%

  • RIO

    -2.5900

    100.08

    -2.59%

  • BCE

    0.0000

    23.28

    0%

  • GSK

    -1.4800

    50.67

    -2.92%

  • VOD

    -0.2300

    14.3

    -1.61%

  • RYCEF

    -0.0300

    18.4

    -0.16%

  • BP

    -1.0400

    39.1

    -2.66%

  • BTI

    -0.5800

    58.91

    -0.98%

  • AZN

    -2.9600

    174.93

    -1.69%

All systems go for Artemis 1 mission to Moon
All systems go for Artemis 1 mission to Moon / Photo: Gregg Newton - AFP/File

All systems go for Artemis 1 mission to Moon

Fifty years after the last Apollo mission, the Artemis program is poised to take up the baton of lunar exploration with a test launch on Monday of NASA's most powerful rocket ever.

Text size:

The goal is to return humans to the Moon for the first time since the last Apollo mission in 1972 -- and eventually to Mars.

The 322-foot (98-meter) Space Launch System (SLS) rocket is scheduled to blast off at 8:33 am (1233 GMT) from the Kennedy Space Center (KSC) in Florida.

The mission, more than a decade in the planning, may be uncrewed, but is highly symbolic for NASA, which has been under pressure from China and private rivals such as SpaceX.

Hotels around Cape Canaveral are booked solid with between 100,000 and 200,000 spectators expected to attend the launch.

The massive orange-and-white rocket has been sitting on KSC's Launch Complex 39B for a week.

"Ever since we rolled out to the pad last week, you can feel the excitement, the energy," said Janet Petro, director of KSC. "It's really, really palpable."

The objective of the flight, baptized Artemis 1, is to test the SLS and the Orion crew capsule that sits atop the rocket.

Mannequins equipped with sensors will take the place of crew members, recording acceleration, vibration and radiation levels.

Cameras will capture every moment of the 42-day trip and include a selfie of the spacecraft with the Moon and Earth in the background.

- Splashdown in Pacific -

The Orion capsule will orbit around the Moon, coming within 60 miles (100 kilometers) at its closest approach and then firing its engines to get to a distance 40,000 miles beyond, a record for a spacecraft rated to carry humans.

One of the primary objectives of the mission is to test the capsule's heat shield, which at 16 feet in diameter is the largest ever built.

On its return to the Earth's atmosphere, the heat shield will have to withstand a speed of 25,000 miles per hour and a temperature of 5,000 degrees Fahrenheit (2,760 degrees Celsius).

Orion, its descent slowed by parachutes, will end its voyage with a splashdown off the coast of San Diego in the Pacific.

Monday's liftoff will be at the mercy of the weather, which can be unpredictable in Florida at this time of year, and NASA has built in a two-hour launch window.

If the rocket is unable to take off on Monday, September 2 and 5 have been penciled in as alternative flight dates.

Otherwise, it's all systems go.

NASA gave the green light for the mission on Tuesday after a detailed inspection known as a flight readiness review.

That doesn't mean things can't go wrong with a rocket and a capsule flying for the first time.

- 'Inherent risk' -

"We're doing something that is incredibly difficult to do and does carry inherent risk in it," said Mike Sarafin, the Artemis 1 mission manager.

Because it is an uncrewed flight, Sarafin said the mission will continue in conditions that would not be acceptable for a flight with astronauts.

"If we had a failed solar array deployment we would proceed, and that is something that we wouldn't necessarily do on a crewed flight," he said.

A complete failure would be devastating for a program that is costing $4.1 billion per launch and is already running years behind schedule.

The next mission, Artemis 2, will take astronauts into orbit around the Moon without landing on its surface. The crew of Artemis 3 is to land on the Moon in 2025 at the earliest.

While the Apollo astronauts who walked on the Moon were exclusively white men, the Artemis program plans to include the first woman and person of color.

And since humans have already visited the Moon, Artemis has its sights set on another lofty goal -- an eventual crewed mission to Mars.

Gateway would serve as a staging and refueling station for a voyage to Mars that would take a minimum of several months.

"I think it's going to inspire even more than Apollo did," Bob Cabana, associate NASA administrator and a former astronaut, said of Artemis. "It's going to be absolutely outstanding."

(K.Müller--BBZ)