Berliner Boersenzeitung - All systems go for Artemis 1 mission to Moon

EUR -
AED 4.343084
AFN 77.459286
ALL 96.579317
AMD 443.005126
ANG 2.116942
AOA 1084.441581
ARS 1696.432015
AUD 1.709698
AWG 2.130448
AZN 2.007214
BAM 1.955381
BBD 2.363494
BDT 143.549257
BGN 1.986018
BHD 0.442405
BIF 3475.455694
BMD 1.182597
BND 1.500979
BOB 8.109263
BRL 6.25641
BSD 1.173449
BTN 107.718931
BWP 16.277514
BYN 3.322089
BYR 23178.895993
BZD 2.360095
CAD 1.622777
CDF 2578.061108
CHF 0.92885
CLF 0.026073
CLP 1029.497459
CNY 8.246959
CNH 8.220248
COP 4228.69438
CRC 580.775621
CUC 1.182597
CUP 31.338813
CVE 110.241391
CZK 24.243347
DJF 208.975246
DKK 7.466902
DOP 73.934166
DZD 153.1562
EGP 55.657722
ERN 17.738951
ETB 182.792653
FJD 2.661203
FKP 0.866824
GBP 0.867324
GEL 3.181352
GGP 0.866824
GHS 12.791261
GIP 0.866824
GMD 86.329097
GNF 10278.798686
GTQ 9.007071
GYD 245.51742
HKD 9.221356
HNL 30.954371
HRK 7.533375
HTG 153.907039
HUF 381.677781
IDR 19840.957581
ILS 3.707263
IMP 0.866824
INR 108.317628
IQD 1537.370756
IRR 49816.887621
ISK 145.778454
JEP 0.866824
JMD 184.72044
JOD 0.838427
JPY 184.148094
KES 151.257607
KGS 103.41761
KHR 4722.988522
KMF 496.691175
KPW 1064.460543
KRW 1710.401436
KWD 0.362346
KYD 0.977991
KZT 590.743486
LAK 25359.568979
LBP 105086.794547
LKR 363.552141
LRD 217.093507
LSL 18.940644
LTL 3.491901
LVL 0.715341
LYD 7.466401
MAD 10.748998
MDL 19.972723
MGA 5308.863051
MKD 61.616804
MMK 2482.620837
MNT 4215.294549
MOP 9.425381
MRU 46.916952
MUR 54.293134
MVR 18.271037
MWK 2034.864212
MXN 20.593728
MYR 4.736893
MZN 75.57967
NAD 18.940644
NGN 1680.541045
NIO 43.180752
NOK 11.543747
NPR 172.350089
NZD 1.990578
OMR 0.454253
PAB 1.173549
PEN 3.936857
PGK 5.018925
PHP 69.734175
PKR 328.344981
PLN 4.206148
PYG 7847.319413
QAR 4.278384
RON 5.10168
RSD 117.374863
RUB 88.771554
RWF 1711.533457
SAR 4.43348
SBD 9.606956
SCR 16.85639
SDG 711.331576
SEK 10.578186
SGD 1.50509
SHP 0.887254
SLE 28.85216
SLL 24798.461354
SOS 669.456629
SRD 45.081813
STD 24477.364748
STN 24.494754
SVC 10.267801
SYP 13079.017154
SZL 18.935945
THB 36.920482
TJS 10.97225
TMT 4.139089
TND 3.416268
TOP 2.847409
TRY 51.247241
TTD 7.971293
TWD 37.116742
TZS 3004.156628
UAH 50.599464
UGX 4148.111638
USD 1.182597
UYU 44.440483
UZS 14242.949721
VES 416.587929
VND 31037.251293
VUV 141.325014
WST 3.258752
XAF 655.81655
XAG 0.011483
XAU 0.000237
XCD 3.196027
XCG 2.114947
XDR 0.815625
XOF 655.81655
XPF 119.331742
YER 281.816102
ZAR 19.042528
ZMK 10644.788392
ZMW 23.02207
ZWL 380.795666
  • SCS

    0.0200

    16.14

    +0.12%

  • JRI

    0.0100

    13.68

    +0.07%

  • BCC

    -1.1800

    84.33

    -1.4%

  • CMSD

    0.0900

    24.13

    +0.37%

  • NGG

    1.3200

    81.5

    +1.62%

  • GSK

    0.5000

    49.15

    +1.02%

  • BCE

    0.4900

    25.2

    +1.94%

  • RBGPF

    -0.8100

    83.23

    -0.97%

  • CMSC

    0.1000

    23.75

    +0.42%

  • RIO

    3.1300

    90.43

    +3.46%

  • RELX

    0.0600

    39.9

    +0.15%

  • RYCEF

    0.3000

    17.12

    +1.75%

  • VOD

    0.2300

    14.17

    +1.62%

  • BTI

    0.9400

    59.16

    +1.59%

  • BP

    1.1000

    36.53

    +3.01%

  • AZN

    1.2600

    92.95

    +1.36%

All systems go for Artemis 1 mission to Moon
All systems go for Artemis 1 mission to Moon / Photo: Gregg Newton - AFP/File

All systems go for Artemis 1 mission to Moon

Fifty years after the last Apollo mission, the Artemis program is poised to take up the baton of lunar exploration with a test launch on Monday of NASA's most powerful rocket ever.

Text size:

The goal is to return humans to the Moon for the first time since the last Apollo mission in 1972 -- and eventually to Mars.

The 322-foot (98-meter) Space Launch System (SLS) rocket is scheduled to blast off at 8:33 am (1233 GMT) from the Kennedy Space Center (KSC) in Florida.

The mission, more than a decade in the planning, may be uncrewed, but is highly symbolic for NASA, which has been under pressure from China and private rivals such as SpaceX.

Hotels around Cape Canaveral are booked solid with between 100,000 and 200,000 spectators expected to attend the launch.

The massive orange-and-white rocket has been sitting on KSC's Launch Complex 39B for a week.

"Ever since we rolled out to the pad last week, you can feel the excitement, the energy," said Janet Petro, director of KSC. "It's really, really palpable."

The objective of the flight, baptized Artemis 1, is to test the SLS and the Orion crew capsule that sits atop the rocket.

Mannequins equipped with sensors will take the place of crew members, recording acceleration, vibration and radiation levels.

Cameras will capture every moment of the 42-day trip and include a selfie of the spacecraft with the Moon and Earth in the background.

- Splashdown in Pacific -

The Orion capsule will orbit around the Moon, coming within 60 miles (100 kilometers) at its closest approach and then firing its engines to get to a distance 40,000 miles beyond, a record for a spacecraft rated to carry humans.

One of the primary objectives of the mission is to test the capsule's heat shield, which at 16 feet in diameter is the largest ever built.

On its return to the Earth's atmosphere, the heat shield will have to withstand a speed of 25,000 miles per hour and a temperature of 5,000 degrees Fahrenheit (2,760 degrees Celsius).

Orion, its descent slowed by parachutes, will end its voyage with a splashdown off the coast of San Diego in the Pacific.

Monday's liftoff will be at the mercy of the weather, which can be unpredictable in Florida at this time of year, and NASA has built in a two-hour launch window.

If the rocket is unable to take off on Monday, September 2 and 5 have been penciled in as alternative flight dates.

Otherwise, it's all systems go.

NASA gave the green light for the mission on Tuesday after a detailed inspection known as a flight readiness review.

That doesn't mean things can't go wrong with a rocket and a capsule flying for the first time.

- 'Inherent risk' -

"We're doing something that is incredibly difficult to do and does carry inherent risk in it," said Mike Sarafin, the Artemis 1 mission manager.

Because it is an uncrewed flight, Sarafin said the mission will continue in conditions that would not be acceptable for a flight with astronauts.

"If we had a failed solar array deployment we would proceed, and that is something that we wouldn't necessarily do on a crewed flight," he said.

A complete failure would be devastating for a program that is costing $4.1 billion per launch and is already running years behind schedule.

The next mission, Artemis 2, will take astronauts into orbit around the Moon without landing on its surface. The crew of Artemis 3 is to land on the Moon in 2025 at the earliest.

While the Apollo astronauts who walked on the Moon were exclusively white men, the Artemis program plans to include the first woman and person of color.

And since humans have already visited the Moon, Artemis has its sights set on another lofty goal -- an eventual crewed mission to Mars.

Gateway would serve as a staging and refueling station for a voyage to Mars that would take a minimum of several months.

"I think it's going to inspire even more than Apollo did," Bob Cabana, associate NASA administrator and a former astronaut, said of Artemis. "It's going to be absolutely outstanding."

(K.Müller--BBZ)