Berliner Boersenzeitung - Camino to Commence Drilling at its Los Chapitos Copper Project in Peru; Peru's Ministry of Energy and Mines Names Los Chapitos Among Top 15 Priority Exploration Projects

EUR -
AED 4.278799
AFN 77.332466
ALL 96.575617
AMD 445.1876
ANG 2.085576
AOA 1068.388216
ARS 1684.735918
AUD 1.75613
AWG 2.09862
AZN 1.984015
BAM 1.955298
BBD 2.351906
BDT 142.873314
BGN 1.955951
BHD 0.439244
BIF 3450.13256
BMD 1.165091
BND 1.512264
BOB 8.068928
BRL 6.18139
BSD 1.167705
BTN 104.895516
BWP 15.51395
BYN 3.380546
BYR 22835.780461
BZD 2.348507
CAD 1.624445
CDF 2598.152383
CHF 0.935795
CLF 0.027249
CLP 1068.972737
CNY 8.239114
CNH 8.235468
COP 4423.838268
CRC 572.550529
CUC 1.165091
CUP 30.874907
CVE 110.236695
CZK 24.215228
DJF 207.947498
DKK 7.468599
DOP 74.200629
DZD 151.573688
EGP 55.422094
ERN 17.476363
ETB 182.080866
FJD 2.631882
FKP 0.872491
GBP 0.87341
GEL 3.139877
GGP 0.872491
GHS 13.301585
GIP 0.872491
GMD 85.051785
GNF 10146.786517
GTQ 8.944742
GYD 244.307269
HKD 9.07004
HNL 30.745973
HRK 7.537941
HTG 152.955977
HUF 381.927241
IDR 19422.821609
ILS 3.76036
IMP 0.872491
INR 104.791181
IQD 1529.71378
IRR 49079.451231
ISK 149.003201
JEP 0.872491
JMD 187.141145
JOD 0.82607
JPY 180.711448
KES 150.704566
KGS 101.886647
KHR 4676.939601
KMF 491.66861
KPW 1048.573823
KRW 1715.887947
KWD 0.35759
KYD 0.973154
KZT 590.220982
LAK 25331.604319
LBP 104570.198293
LKR 360.448994
LRD 206.107962
LSL 19.822595
LTL 3.44021
LVL 0.704752
LYD 6.347397
MAD 10.774234
MDL 19.862985
MGA 5193.64414
MKD 61.624177
MMK 2446.620372
MNT 4131.997126
MOP 9.362236
MRU 46.266921
MUR 53.675364
MVR 17.954132
MWK 2024.871384
MXN 21.185039
MYR 4.789718
MZN 74.447687
NAD 19.822595
NGN 1690.547045
NIO 42.970442
NOK 11.774198
NPR 167.831186
NZD 2.017279
OMR 0.448002
PAB 1.1678
PEN 3.926892
PGK 4.952877
PHP 68.813177
PKR 329.883811
PLN 4.230421
PYG 8097.955442
QAR 4.268104
RON 5.093784
RSD 117.405001
RUB 89.428762
RWF 1699.056442
SAR 4.372624
SBD 9.581501
SCR 15.83572
SDG 700.739077
SEK 10.962357
SGD 1.508886
SHP 0.87412
SLE 26.796781
SLL 24431.370198
SOS 666.226074
SRD 45.023191
STD 24115.028075
STN 24.494657
SVC 10.21742
SYP 12883.858981
SZL 19.816827
THB 37.09708
TJS 10.731491
TMT 4.077818
TND 3.427635
TOP 2.805259
TRY 49.532165
TTD 7.917001
TWD 36.455959
TZS 2842.8212
UAH 49.235746
UGX 4139.936989
USD 1.165091
UYU 45.74845
UZS 13910.428222
VES 289.625154
VND 30711.794538
VUV 142.222766
WST 3.250779
XAF 655.7858
XAG 0.020016
XAU 0.000276
XCD 3.148716
XCG 2.104569
XDR 0.815587
XOF 655.791427
XPF 119.331742
YER 277.75676
ZAR 19.715959
ZMK 10487.212054
ZMW 26.828226
ZWL 375.158775
  • RBGPF

    0.0000

    78.35

    0%

  • CMSC

    0.0400

    23.48

    +0.17%

  • VOD

    0.0500

    12.64

    +0.4%

  • RIO

    -0.5500

    73.73

    -0.75%

  • NGG

    -0.5800

    75.91

    -0.76%

  • GSK

    -0.4000

    48.57

    -0.82%

  • RYCEF

    0.4600

    14.67

    +3.14%

  • AZN

    -0.8200

    90.03

    -0.91%

  • RELX

    0.3500

    40.54

    +0.86%

  • BTI

    0.5300

    58.04

    +0.91%

  • BP

    -0.0100

    37.23

    -0.03%

  • CMSD

    -0.0300

    23.32

    -0.13%

  • JRI

    0.0500

    13.75

    +0.36%

  • SCS

    -0.1200

    16.23

    -0.74%

  • BCC

    -2.3000

    74.26

    -3.1%

  • BCE

    0.0400

    23.22

    +0.17%

Camino to Commence Drilling at its Los Chapitos Copper Project in Peru; Peru's Ministry of Energy and Mines Names Los Chapitos Among Top 15 Priority Exploration Projects
Camino to Commence Drilling at its Los Chapitos Copper Project in Peru; Peru's Ministry of Energy and Mines Names Los Chapitos Among Top 15 Priority Exploration Projects

Camino to Commence Drilling at its Los Chapitos Copper Project in Peru; Peru's Ministry of Energy and Mines Names Los Chapitos Among Top 15 Priority Exploration Projects

VANCOUVER, BC, AB / ACCESS Newswire / October 15, 2025 / Camino Minerals Corporation (TSXV:COR)(OTCID:CAMZF) ("Camino" or the "Company") is pleased to announce the mobilization of drilling equipment to commence the discovery drilling campaign at its Los Chapitos copper project in Peru ("Los Chapitos" or the "Project"). The 2025 exploration campaign with Camino's partner, Nittetsu Mining Co., Ltd. ("Nittetsu"), resulted in the identification of several prospective drilling targets. The drilling campaign will focus on two main objectives: discovering new copper-silver deposits in newly identified and undrilled targets, such as Mirador, Piloto, Maqui, and Sombrero Blanco, where notable copper occurrences have been found with high copper and silver values ​​according to geochemical results of rocks in trenches, and extending known mineralization in previously drilled Adriana, Lourdes, and Katty (Enjambre) zones.

Text size:

Highlights:

  • The latest results of trenching at the targets to be drilled showed:

    • Mirador: 129m @0.98 % Cu and 20.59 ppm Ag (including: 90m @ 1.07% Cu and 20.98 ppm Ag; 12m @ 2.07% Cu and 60.63 ppm Ag; 26m @ 1.30% Cu and 28.96 ppm Ag)

    • Piloto: 12m @2.3% Cu and 21.13 ppm Ag.

    • Maqui: 7m @4.3% Cu and 25.5 ppm Ag.

    • Enjambre: 18m @1.57% Cu and 11.35 ppm Ag.

    • Adriana: 15m @0.75% Cu and 9.46 ppm Ag.

    • Lourdes: 6m @2.80% Cu and 31.55 ppm Ag.

    • Sombrero Blanco: 25m @0.52% Cu and 3.00 ppm Ag.

  • Copper mineralization is associated with copper oxides and sulfides hosted in intrusive and volcanic rocks.

  • Strong positive correlation between copper and silver mineralization.

  • Drilling is planned to begin the first week of November 2025.

  • Los Chapitos selected by Peru's Ministry of Energy and Mines (MINEM) as one of 15 priority exploration projects.

Los Chapitos is Camino's exploration copper project with partner Nittetsu, which is earning a 35% interest upon completing a total investment of CDN$10 Million (see news release dated June 14, 2023). Rio Tinto, a major copper producer, recently staked claims adjacent to Los Chapitos (see news release dated May 17, 2024). Camino is also advancing its mine development project, the construction-ready Puquios copper project, with Nittetsu in Chile (see news release dated April 17, 2025). 

"Los Chapitos has been recognized by Peru's Ministry of Energy and Minesto advance strategic mineral exploration in 2025 and 2026 to meet the national Perú Explora initiative. Indeed, we are also getting noticed by major mining companies like Rio Tinto that have staked ground adjacent to Los Chapitos", commented Jay Chmelauskas, CEO of Camino. "Our Los Chapitos exploration drilling campaign is set to start in November in Peru, while we get our finance package in place for the construction of our Puquios copper mine in Chile."

"Drilling at Los Chapitos follows intensive geological field work, including geological mapping, sampling of soil and rock, and mechanized trenching at targets located within the Diva and La Estancia trends this year," said Orlando Pariona, lead geologist at Camino Corp. "This has allowed us to identify targets with the greatest potential for extending and/or discovering additional Cu-Ag mineralized bodies."

Figure 1. Occurrence of copper oxides and bornite at the Maqui target.
Figure 2. Drilling campaign target locations.
 

Los Chapitos Drill Campaign
The objective of this drilling campaign is to cut mineralized breccias and copper mantos that have been identified on the surface through detailed mapping and mechanized trenching, to search for continuity and extension at depth and validate the high copper and silver grades observed at surface. The program will commence with approximately 9 drillholes consisting of 1,200 metres and is expected to expand to over 3,000 metres with the next $1.5 million Nittetsu investment tranche anticipated in December 2025.

The drilling targets are located along the Diva and La Estancia trends, where the latest exploration work has demonstrated high-grade copper potential at Los Chapitos (see news releases dated June 17, 2025 and July 16, 2025). The targets in the Diva trend will be Mirador, Adriana, Katty (Piloto, Maqui, and Enjambre), and Lourdes. Sombrero Blanco is along the La Estancia trend and is a high priority target once certain drilling permits are obtained.

This new program builds on the results obtained during the drilling campaigns from 2017 to 2023, which confirmed the presence of high-grade copper mineralization in volcanic rocks of the Chocolate Formation, particularly in the Adriana, Lourdes, and Enjambre sectors. Based on these results, Camino's geological team has developed detailed 3D models of the mineralized system, based on high-resolution structural and lithological mapping.

Los Chapitos is in a strategic location with road access, infrastructure availability, and proximity to the Pacific coast, offering significant logistical advantages for the future development of the project. Excavators and drilling rigs will be mobilized to Los Chapitos during October, 2025 to prepare drilling pads for the start of drilling in November.

The drilling target expressed in this release is conceptual in nature. The target has had insufficient exploration to define a mineral resource, and it is uncertain if further exploration will result in the exploration target being delineated as a mineral resource.

Los Chapitos Project Update
The Los Chapitos Project has been selected by Peru's Ministry of Energy and Mines ("MINEM") as one of 15 priority exploration projects within the national initiative "Perú Explora: Actions to Drive the Advancement of Strategic Mineral Exploration Projects 2025-2026."

Since July 2025, MINEM has been holding technical working meetings with the companies leading Peru's key exploration projects. The goal of this initiative is to facilitate permitting processes, attract new exploration investment, and strengthen a sustainable portfolio of projects with both regional and national impact.

In September 2025, Camino participated in a work session at the Ministry of Energy and Mines with representatives from the Directorate of Mining Promotion, the Directorate of Environmental Mining Affairs, and the General Directorate of Mining, reaffirming its commitment to advancing responsible and sustainable mineral exploration in Peru.

About Camino
Camino is a discovery and development stage copper exploration company. On October 7, 2024, Camino signed a Definitive Agreement to purchase the construction-ready Puquios copper mine in Chile. Camino is focused on developing copper producing assets such as Puquios, and advancing its IOCG Los Chapitos copper project located in Peru through to resource delineation and development, and to add new discoveries. Camino has also permitted the Maria Cecilia copper porphyry project for exploration discovery drilling to add to its NI43-101 resources. In addition, Camino has increased its land position at its copper and silver Plata Dorada project. Camino seeks to acquire a portfolio of advanced copper assets that have the potential to deliver copper into an electrifying copper intensive global economy. For more information, please refer to Camino's website at www.caminocorp.com.

Jose A. Bassan, MSc. Geologist, an independent geologist FAusIMM (CP) 227922, a qualified person as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects, has reviewed and approved the technical contents of this document. Mr. Bassan has reviewed and verified relevant data supporting the technical disclosure, including sampling and analytical test data. Mr. Bassan has verified the data through site visits, inspection of drill core, review of original assay certificates, and confirmation of QA/QC protocols. No limitations were encountered during the verification process, and the data is considered reliable for the purposes of this disclosure.

ON BEHALF OF THE BOARD

For further information, please contact:

/S/ "Jay Chmelauskas"

Camino Investor Relations

President and CEO

[email protected]

Tel: (604) 493-2058

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward Looking Statements: Certain disclosures in this release constitute forward-looking information within the meaning of applicable securities laws. Forward-looking statements are included to provide information about management's current expectations and plans that allows investors and others to have a better understanding of the Company's business plans and financial performance and condition. All statements, other than statements of historical fact included in this release are forward-looking statements that involve risks and uncertainties. Forward-looking information is typically (though not always) identified by words such as "plan", "expect", "estimate", "intend", "anticipate", "believe", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved. In making the forward-looking disclosures in this release, the Company has applied certain factors and assumptions that are based on the Company's current beliefs as well as assumptions made by and information currently available to the Company. Forward-looking information in the release includes, without limitation, statements with respect to a future finance package and construction of Puquios, prospectivity of future exploration work at Los Chapitos, future planned drilling programs, and prospectivity for copper exploration in new targets. Although the Company considers the assumptions underlying such forward-looking information to be reasonable based on information currently available to it, they may prove to be incorrect, and the forward-looking information in this release is subject to numerous risks, uncertainties and other factors that may cause future results to differ materially from those expressed or implied in such forward-looking information. Such risk factors include, among others, that actual results of the Company's exploration activities may be different than those expected by management, that the Company may not realize the benefits of joint ventures and/or strategic partnerships with respect to the Company's properties, that the Company may be unable to obtain or may experience delays in obtaining any required authorizations and approvals and the state of equity and commodity markets. Readers are cautioned not to place undue reliance on forward-looking statements. The Company does not intend, and expressly disclaims any intention or obligation to, update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as required by law.

SOURCE: Camino Minerals Corp



View the original press release on ACCESS Newswire

(P.Werner--BBZ)