Berliner Boersenzeitung - Camino to Commence Drilling at its Los Chapitos Copper Project in Peru; Peru's Ministry of Energy and Mines Names Los Chapitos Among Top 15 Priority Exploration Projects

EUR -
AED 4.021574
AFN 71.178362
ALL 89.791845
AMD 395.364091
ANG 1.960582
AOA 1004.161831
ARS 1748.155722
AUD 1.643495
AWG 1.973829
AZN 1.859402
BAM 1.955622
BBD 2.208699
BDT 137.51751
BGN 1.94204
BHD 0.413562
BIF 3294.800747
BMD 1.095051
BND 1.414272
BOB 13.000819
BRL 6.087495
BSD 1.0966
BTN 102.037732
BWP 16.223526
BYN 3.2997
BYR 21462.990606
BZD 2.2055
CAD 1.560031
CDF 2496.715467
CHF 0.915531
CLF 0.028747
CLP 1131.387241
CNY 7.297966
CNH 7.288821
COP 3822.452823
CRC 486.855781
CUC 1.095051
CUP 26.31861
CVE 110.254986
CZK 24.427953
DJF 195.282263
DKK 7.483243
DOP 65.604041
DZD 149.525419
EGP 59.691578
ERN 16.425758
ETB 179.263618
FJD 2.511115
FKP 0.835798
GBP 0.835948
GEL 2.835831
GGP 0.835798
GHS 13.022817
GIP 0.835798
GMD 81.033675
GNF 9728.116436
GTQ 8.384238
GYD 229.389166
HKD 8.574301
HNL 29.481322
HRK 7.481347
HTG 143.886931
HUF 370.610541
IDR 20099.050405
ILS 3.643451
IMP 0.835798
INR 101.834773
IQD 1662.449007
IRR 2146480.839164
ISK 137.396291
JEP 0.835798
JMD 173.554237
JOD 0.776397
JPY 174.7208
KES 142.777032
KGS 95.762334
KHR 4458.595044
KMF 491.677884
KPW 985.54587
KRW 1460.523699
KWD 0.342445
KYD 0.913917
KZT 502.694342
LAK 24731.753718
LBP 98202.780653
LKR 365.336818
LRD 179.843666
LSL 19.035071
LTL 3.2334
LVL 0.662385
LYD 7.108354
MAD 10.990902
MDL 20.189166
MGA 4965.549
MKD 61.54941
MMK 2299.619354
MNT 3953.130591
MOP 8.842497
MRU 44.501958
MUR 51.302845
MVR 16.863408
MWK 1901.527292
MXN 21.51829
MYR 4.512487
MZN 70.357047
NAD 19.035071
NGN 1485.490658
NIO 40.356335
NOK 10.733249
NPR 163.260172
NZD 2.001175
OMR 0.418672
PAB 1.0966
PEN 3.803655
PGK 5.018544
PHP 69.816039
PKR 303.024978
PLN 4.469279
PYG 7064.358374
QAR 3.997637
RON 5.349106
RSD 117.659313
RUB 90.06182
RWF 1620.952776
SAR 4.109977
SBD 8.954405
SCR 15.181821
SDG 658.671727
SEK 11.230729
SGD 1.412026
SHP 0.836459
SLE 25.18601
SLL 22962.666335
SOS 626.743076
SRD 40.801217
STD 22665.335303
STN 24.497775
SVC 9.595129
SYP 14237.847505
SZL 19.030272
THB 37.174781
TJS 10.176676
TMT 3.832677
TND 3.323898
TOP 2.636619
TRY 55.567019
TTD 7.440324
TWD 36.138967
TZS 2947.232315
UAH 49.375115
UGX 4731.570251
USD 1.095051
UYU 44.645945
UZS 13181.802752
VES 1008.958214
VND 28292.273306
VUV 133.122594
WST 3.108296
XAF 655.957
XAG 0.025033
XAU 0.000299675993
XCD 2.959429
XCG 1.97642
XDR 0.774258
XOF 655.957
XPF 119.331742
YER 259.092416
ZAR 19.026519
ZMK 9856.770783
ZMW 22.891921
ZWL 352.605827
SSP 6324.354975
MXV 2.407262
  • CMSD

    -0.1200

    19.81

    -0.61%

  • JRI

    0.0000

    10.77

    0%

  • BCC

    -1.8200

    74.15

    -2.45%

  • CMSC

    -0.2228

    19.53

    -1.14%

  • BCE

    0.2000

    20.34

    +0.98%

  • RIO

    0.0100

    94.17

    +0.01%

  • AZN

    -2.7400

    161.47

    -1.7%

  • GSK

    -1.1800

    48.17

    -2.45%

  • RBGPF

    0.0000

    65

    0%

  • NGG

    0.8800

    75.82

    +1.16%

  • RYCEF

    -0.7300

    19.08

    -3.83%

  • BTI

    -0.4500

    54.4

    -0.83%

  • BP

    0.4700

    43.99

    +1.07%

  • RELX

    -0.0600

    33.18

    -0.18%

  • VOD

    -0.1800

    16.15

    -1.11%

Camino to Commence Drilling at its Los Chapitos Copper Project in Peru; Peru's Ministry of Energy and Mines Names Los Chapitos Among Top 15 Priority Exploration Projects
Camino to Commence Drilling at its Los Chapitos Copper Project in Peru; Peru's Ministry of Energy and Mines Names Los Chapitos Among Top 15 Priority Exploration Projects

Camino to Commence Drilling at its Los Chapitos Copper Project in Peru; Peru's Ministry of Energy and Mines Names Los Chapitos Among Top 15 Priority Exploration Projects

VANCOUVER, BC, AB / ACCESS Newswire / October 15, 2025 / Camino Minerals Corporation (TSXV:COR)(OTCID:CAMZF) ("Camino" or the "Company") is pleased to announce the mobilization of drilling equipment to commence the discovery drilling campaign at its Los Chapitos copper project in Peru ("Los Chapitos" or the "Project"). The 2025 exploration campaign with Camino's partner, Nittetsu Mining Co., Ltd. ("Nittetsu"), resulted in the identification of several prospective drilling targets. The drilling campaign will focus on two main objectives: discovering new copper-silver deposits in newly identified and undrilled targets, such as Mirador, Piloto, Maqui, and Sombrero Blanco, where notable copper occurrences have been found with high copper and silver values ​​according to geochemical results of rocks in trenches, and extending known mineralization in previously drilled Adriana, Lourdes, and Katty (Enjambre) zones.

Text size:

Highlights:

  • The latest results of trenching at the targets to be drilled showed:

    • Mirador: 129m @0.98 % Cu and 20.59 ppm Ag (including: 90m @ 1.07% Cu and 20.98 ppm Ag; 12m @ 2.07% Cu and 60.63 ppm Ag; 26m @ 1.30% Cu and 28.96 ppm Ag)

    • Piloto: 12m @2.3% Cu and 21.13 ppm Ag.

    • Maqui: 7m @4.3% Cu and 25.5 ppm Ag.

    • Enjambre: 18m @1.57% Cu and 11.35 ppm Ag.

    • Adriana: 15m @0.75% Cu and 9.46 ppm Ag.

    • Lourdes: 6m @2.80% Cu and 31.55 ppm Ag.

    • Sombrero Blanco: 25m @0.52% Cu and 3.00 ppm Ag.

  • Copper mineralization is associated with copper oxides and sulfides hosted in intrusive and volcanic rocks.

  • Strong positive correlation between copper and silver mineralization.

  • Drilling is planned to begin the first week of November 2025.

  • Los Chapitos selected by Peru's Ministry of Energy and Mines (MINEM) as one of 15 priority exploration projects.

Los Chapitos is Camino's exploration copper project with partner Nittetsu, which is earning a 35% interest upon completing a total investment of CDN$10 Million (see news release dated June 14, 2023). Rio Tinto, a major copper producer, recently staked claims adjacent to Los Chapitos (see news release dated May 17, 2024). Camino is also advancing its mine development project, the construction-ready Puquios copper project, with Nittetsu in Chile (see news release dated April 17, 2025). 

"Los Chapitos has been recognized by Peru's Ministry of Energy and Minesto advance strategic mineral exploration in 2025 and 2026 to meet the national Perú Explora initiative. Indeed, we are also getting noticed by major mining companies like Rio Tinto that have staked ground adjacent to Los Chapitos", commented Jay Chmelauskas, CEO of Camino. "Our Los Chapitos exploration drilling campaign is set to start in November in Peru, while we get our finance package in place for the construction of our Puquios copper mine in Chile."

"Drilling at Los Chapitos follows intensive geological field work, including geological mapping, sampling of soil and rock, and mechanized trenching at targets located within the Diva and La Estancia trends this year," said Orlando Pariona, lead geologist at Camino Corp. "This has allowed us to identify targets with the greatest potential for extending and/or discovering additional Cu-Ag mineralized bodies."

Figure 1. Occurrence of copper oxides and bornite at the Maqui target.
Figure 2. Drilling campaign target locations.
 

Los Chapitos Drill Campaign
The objective of this drilling campaign is to cut mineralized breccias and copper mantos that have been identified on the surface through detailed mapping and mechanized trenching, to search for continuity and extension at depth and validate the high copper and silver grades observed at surface. The program will commence with approximately 9 drillholes consisting of 1,200 metres and is expected to expand to over 3,000 metres with the next $1.5 million Nittetsu investment tranche anticipated in December 2025.

The drilling targets are located along the Diva and La Estancia trends, where the latest exploration work has demonstrated high-grade copper potential at Los Chapitos (see news releases dated June 17, 2025 and July 16, 2025). The targets in the Diva trend will be Mirador, Adriana, Katty (Piloto, Maqui, and Enjambre), and Lourdes. Sombrero Blanco is along the La Estancia trend and is a high priority target once certain drilling permits are obtained.

This new program builds on the results obtained during the drilling campaigns from 2017 to 2023, which confirmed the presence of high-grade copper mineralization in volcanic rocks of the Chocolate Formation, particularly in the Adriana, Lourdes, and Enjambre sectors. Based on these results, Camino's geological team has developed detailed 3D models of the mineralized system, based on high-resolution structural and lithological mapping.

Los Chapitos is in a strategic location with road access, infrastructure availability, and proximity to the Pacific coast, offering significant logistical advantages for the future development of the project. Excavators and drilling rigs will be mobilized to Los Chapitos during October, 2025 to prepare drilling pads for the start of drilling in November.

The drilling target expressed in this release is conceptual in nature. The target has had insufficient exploration to define a mineral resource, and it is uncertain if further exploration will result in the exploration target being delineated as a mineral resource.

Los Chapitos Project Update
The Los Chapitos Project has been selected by Peru's Ministry of Energy and Mines ("MINEM") as one of 15 priority exploration projects within the national initiative "Perú Explora: Actions to Drive the Advancement of Strategic Mineral Exploration Projects 2025-2026."

Since July 2025, MINEM has been holding technical working meetings with the companies leading Peru's key exploration projects. The goal of this initiative is to facilitate permitting processes, attract new exploration investment, and strengthen a sustainable portfolio of projects with both regional and national impact.

In September 2025, Camino participated in a work session at the Ministry of Energy and Mines with representatives from the Directorate of Mining Promotion, the Directorate of Environmental Mining Affairs, and the General Directorate of Mining, reaffirming its commitment to advancing responsible and sustainable mineral exploration in Peru.

About Camino
Camino is a discovery and development stage copper exploration company. On October 7, 2024, Camino signed a Definitive Agreement to purchase the construction-ready Puquios copper mine in Chile. Camino is focused on developing copper producing assets such as Puquios, and advancing its IOCG Los Chapitos copper project located in Peru through to resource delineation and development, and to add new discoveries. Camino has also permitted the Maria Cecilia copper porphyry project for exploration discovery drilling to add to its NI43-101 resources. In addition, Camino has increased its land position at its copper and silver Plata Dorada project. Camino seeks to acquire a portfolio of advanced copper assets that have the potential to deliver copper into an electrifying copper intensive global economy. For more information, please refer to Camino's website at www.caminocorp.com.

Jose A. Bassan, MSc. Geologist, an independent geologist FAusIMM (CP) 227922, a qualified person as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects, has reviewed and approved the technical contents of this document. Mr. Bassan has reviewed and verified relevant data supporting the technical disclosure, including sampling and analytical test data. Mr. Bassan has verified the data through site visits, inspection of drill core, review of original assay certificates, and confirmation of QA/QC protocols. No limitations were encountered during the verification process, and the data is considered reliable for the purposes of this disclosure.

ON BEHALF OF THE BOARD

For further information, please contact:

/S/ "Jay Chmelauskas"

Camino Investor Relations

President and CEO

[email protected]

Tel: (604) 493-2058

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward Looking Statements: Certain disclosures in this release constitute forward-looking information within the meaning of applicable securities laws. Forward-looking statements are included to provide information about management's current expectations and plans that allows investors and others to have a better understanding of the Company's business plans and financial performance and condition. All statements, other than statements of historical fact included in this release are forward-looking statements that involve risks and uncertainties. Forward-looking information is typically (though not always) identified by words such as "plan", "expect", "estimate", "intend", "anticipate", "believe", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved. In making the forward-looking disclosures in this release, the Company has applied certain factors and assumptions that are based on the Company's current beliefs as well as assumptions made by and information currently available to the Company. Forward-looking information in the release includes, without limitation, statements with respect to a future finance package and construction of Puquios, prospectivity of future exploration work at Los Chapitos, future planned drilling programs, and prospectivity for copper exploration in new targets. Although the Company considers the assumptions underlying such forward-looking information to be reasonable based on information currently available to it, they may prove to be incorrect, and the forward-looking information in this release is subject to numerous risks, uncertainties and other factors that may cause future results to differ materially from those expressed or implied in such forward-looking information. Such risk factors include, among others, that actual results of the Company's exploration activities may be different than those expected by management, that the Company may not realize the benefits of joint ventures and/or strategic partnerships with respect to the Company's properties, that the Company may be unable to obtain or may experience delays in obtaining any required authorizations and approvals and the state of equity and commodity markets. Readers are cautioned not to place undue reliance on forward-looking statements. The Company does not intend, and expressly disclaims any intention or obligation to, update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as required by law.

SOURCE: Camino Minerals Corp



View the original press release on ACCESS Newswire

(P.Werner--BBZ)