Berliner Boersenzeitung - Camino to Commence Drilling at its Los Chapitos Copper Project in Peru; Peru's Ministry of Energy and Mines Names Los Chapitos Among Top 15 Priority Exploration Projects

EUR -
AED 4.257284
AFN 73.61114
ALL 95.76109
AMD 436.872538
ANG 2.074715
AOA 1063.015882
ARS 1622.367014
AUD 1.620624
AWG 2.086619
AZN 1.962852
BAM 1.949858
BBD 2.337039
BDT 142.126913
BGN 1.910005
BHD 0.437631
BIF 3444.009456
BMD 1.159233
BND 1.475648
BOB 8.017672
BRL 6.016299
BSD 1.160399
BTN 106.535287
BWP 15.506151
BYN 3.407974
BYR 22720.959083
BZD 2.333649
CAD 1.572737
CDF 2521.331008
CHF 0.902897
CLF 0.026105
CLP 1030.777978
CNY 7.972068
CNH 7.970976
COP 4301.807871
CRC 547.944493
CUC 1.159233
CUP 30.719664
CVE 109.930969
CZK 24.404149
DJF 206.625721
DKK 7.471996
DOP 69.659537
DZD 152.572269
EGP 60.038143
ERN 17.388489
ETB 179.987902
FJD 2.547819
FKP 0.861385
GBP 0.864701
GEL 3.152854
GGP 0.861385
GHS 12.520011
GIP 0.861385
GMD 84.623795
GNF 10172.310237
GTQ 8.896966
GYD 242.763397
HKD 9.072531
HNL 30.712209
HRK 7.523073
HTG 152.150962
HUF 387.337892
IDR 19577.120255
ILS 3.596299
IMP 0.861385
INR 106.639024
IQD 1520.081148
IRR 1532157.735304
ISK 145.704135
JEP 0.861385
JMD 182.069912
JOD 0.82192
JPY 183.719836
KES 149.876227
KGS 101.375087
KHR 4656.950026
KMF 490.355379
KPW 1043.349102
KRW 1711.079452
KWD 0.355617
KYD 0.966962
KZT 565.431903
LAK 24856.579093
LBP 103909.306613
LKR 360.685592
LRD 212.336635
LSL 18.886494
LTL 3.422912
LVL 0.701209
LYD 7.407651
MAD 10.820368
MDL 19.969751
MGA 4813.457085
MKD 61.567423
MMK 2433.734987
MNT 4151.10701
MOP 9.350248
MRU 46.058842
MUR 53.220595
MVR 17.921451
MWK 2012.021073
MXN 20.460745
MYR 4.536655
MZN 74.074403
NAD 18.886413
NGN 1619.251053
NIO 42.701171
NOK 11.153615
NPR 170.458992
NZD 1.958014
OMR 0.445726
PAB 1.160379
PEN 4.047965
PGK 5.001888
PHP 68.618425
PKR 324.201587
PLN 4.271546
PYG 7555.173527
QAR 4.231343
RON 5.092273
RSD 117.398366
RUB 91.775048
RWF 1696.374737
SAR 4.350456
SBD 9.333747
SCR 15.951114
SDG 696.698563
SEK 10.656188
SGD 1.476503
SHP 0.869725
SLE 28.515268
SLL 24308.527385
SOS 661.999897
SRD 43.516413
STD 23993.774469
STN 24.426306
SVC 10.153149
SYP 128.96611
SZL 18.891922
THB 36.78419
TJS 11.104355
TMT 4.068906
TND 3.393489
TOP 2.791154
TRY 51.103825
TTD 7.873111
TWD 36.867657
TZS 2990.820457
UAH 50.913276
UGX 4298.955922
USD 1.159233
UYU 46.798205
UZS 14104.083114
VES 505.073699
VND 30432.753997
VUV 138.436711
WST 3.16557
XAF 653.981124
XAG 0.013324
XAU 0.000224
XCD 3.132884
XCG 2.091146
XDR 0.813343
XOF 653.983937
XPF 119.331742
YER 276.595351
ZAR 18.981853
ZMK 10434.483834
ZMW 22.510987
ZWL 373.272426
  • CMSC

    0.0300

    23.25

    +0.13%

  • RIO

    1.3300

    91.68

    +1.45%

  • NGG

    -0.5600

    89.85

    -0.62%

  • GSK

    -0.1900

    55.32

    -0.34%

  • BTI

    1.0800

    59.41

    +1.82%

  • RBGPF

    0.1000

    82.5

    +0.12%

  • BCE

    0.5100

    26.39

    +1.93%

  • BP

    -0.7100

    39.94

    -1.78%

  • BCC

    -1.9500

    72.54

    -2.69%

  • CMSD

    -0.0800

    23.08

    -0.35%

  • AZN

    0.0400

    194.99

    +0.02%

  • JRI

    0.0600

    12.64

    +0.47%

  • VOD

    -0.0200

    14.46

    -0.14%

  • RYCEF

    0.7800

    17.68

    +4.41%

  • RELX

    -0.4900

    35.19

    -1.39%

Camino to Commence Drilling at its Los Chapitos Copper Project in Peru; Peru's Ministry of Energy and Mines Names Los Chapitos Among Top 15 Priority Exploration Projects
Camino to Commence Drilling at its Los Chapitos Copper Project in Peru; Peru's Ministry of Energy and Mines Names Los Chapitos Among Top 15 Priority Exploration Projects

Camino to Commence Drilling at its Los Chapitos Copper Project in Peru; Peru's Ministry of Energy and Mines Names Los Chapitos Among Top 15 Priority Exploration Projects

VANCOUVER, BC, AB / ACCESS Newswire / October 15, 2025 / Camino Minerals Corporation (TSXV:COR)(OTCID:CAMZF) ("Camino" or the "Company") is pleased to announce the mobilization of drilling equipment to commence the discovery drilling campaign at its Los Chapitos copper project in Peru ("Los Chapitos" or the "Project"). The 2025 exploration campaign with Camino's partner, Nittetsu Mining Co., Ltd. ("Nittetsu"), resulted in the identification of several prospective drilling targets. The drilling campaign will focus on two main objectives: discovering new copper-silver deposits in newly identified and undrilled targets, such as Mirador, Piloto, Maqui, and Sombrero Blanco, where notable copper occurrences have been found with high copper and silver values ​​according to geochemical results of rocks in trenches, and extending known mineralization in previously drilled Adriana, Lourdes, and Katty (Enjambre) zones.

Text size:

Highlights:

  • The latest results of trenching at the targets to be drilled showed:

    • Mirador: 129m @0.98 % Cu and 20.59 ppm Ag (including: 90m @ 1.07% Cu and 20.98 ppm Ag; 12m @ 2.07% Cu and 60.63 ppm Ag; 26m @ 1.30% Cu and 28.96 ppm Ag)

    • Piloto: 12m @2.3% Cu and 21.13 ppm Ag.

    • Maqui: 7m @4.3% Cu and 25.5 ppm Ag.

    • Enjambre: 18m @1.57% Cu and 11.35 ppm Ag.

    • Adriana: 15m @0.75% Cu and 9.46 ppm Ag.

    • Lourdes: 6m @2.80% Cu and 31.55 ppm Ag.

    • Sombrero Blanco: 25m @0.52% Cu and 3.00 ppm Ag.

  • Copper mineralization is associated with copper oxides and sulfides hosted in intrusive and volcanic rocks.

  • Strong positive correlation between copper and silver mineralization.

  • Drilling is planned to begin the first week of November 2025.

  • Los Chapitos selected by Peru's Ministry of Energy and Mines (MINEM) as one of 15 priority exploration projects.

Los Chapitos is Camino's exploration copper project with partner Nittetsu, which is earning a 35% interest upon completing a total investment of CDN$10 Million (see news release dated June 14, 2023). Rio Tinto, a major copper producer, recently staked claims adjacent to Los Chapitos (see news release dated May 17, 2024). Camino is also advancing its mine development project, the construction-ready Puquios copper project, with Nittetsu in Chile (see news release dated April 17, 2025). 

"Los Chapitos has been recognized by Peru's Ministry of Energy and Minesto advance strategic mineral exploration in 2025 and 2026 to meet the national Perú Explora initiative. Indeed, we are also getting noticed by major mining companies like Rio Tinto that have staked ground adjacent to Los Chapitos", commented Jay Chmelauskas, CEO of Camino. "Our Los Chapitos exploration drilling campaign is set to start in November in Peru, while we get our finance package in place for the construction of our Puquios copper mine in Chile."

"Drilling at Los Chapitos follows intensive geological field work, including geological mapping, sampling of soil and rock, and mechanized trenching at targets located within the Diva and La Estancia trends this year," said Orlando Pariona, lead geologist at Camino Corp. "This has allowed us to identify targets with the greatest potential for extending and/or discovering additional Cu-Ag mineralized bodies."

Figure 1. Occurrence of copper oxides and bornite at the Maqui target.
Figure 2. Drilling campaign target locations.
 

Los Chapitos Drill Campaign
The objective of this drilling campaign is to cut mineralized breccias and copper mantos that have been identified on the surface through detailed mapping and mechanized trenching, to search for continuity and extension at depth and validate the high copper and silver grades observed at surface. The program will commence with approximately 9 drillholes consisting of 1,200 metres and is expected to expand to over 3,000 metres with the next $1.5 million Nittetsu investment tranche anticipated in December 2025.

The drilling targets are located along the Diva and La Estancia trends, where the latest exploration work has demonstrated high-grade copper potential at Los Chapitos (see news releases dated June 17, 2025 and July 16, 2025). The targets in the Diva trend will be Mirador, Adriana, Katty (Piloto, Maqui, and Enjambre), and Lourdes. Sombrero Blanco is along the La Estancia trend and is a high priority target once certain drilling permits are obtained.

This new program builds on the results obtained during the drilling campaigns from 2017 to 2023, which confirmed the presence of high-grade copper mineralization in volcanic rocks of the Chocolate Formation, particularly in the Adriana, Lourdes, and Enjambre sectors. Based on these results, Camino's geological team has developed detailed 3D models of the mineralized system, based on high-resolution structural and lithological mapping.

Los Chapitos is in a strategic location with road access, infrastructure availability, and proximity to the Pacific coast, offering significant logistical advantages for the future development of the project. Excavators and drilling rigs will be mobilized to Los Chapitos during October, 2025 to prepare drilling pads for the start of drilling in November.

The drilling target expressed in this release is conceptual in nature. The target has had insufficient exploration to define a mineral resource, and it is uncertain if further exploration will result in the exploration target being delineated as a mineral resource.

Los Chapitos Project Update
The Los Chapitos Project has been selected by Peru's Ministry of Energy and Mines ("MINEM") as one of 15 priority exploration projects within the national initiative "Perú Explora: Actions to Drive the Advancement of Strategic Mineral Exploration Projects 2025-2026."

Since July 2025, MINEM has been holding technical working meetings with the companies leading Peru's key exploration projects. The goal of this initiative is to facilitate permitting processes, attract new exploration investment, and strengthen a sustainable portfolio of projects with both regional and national impact.

In September 2025, Camino participated in a work session at the Ministry of Energy and Mines with representatives from the Directorate of Mining Promotion, the Directorate of Environmental Mining Affairs, and the General Directorate of Mining, reaffirming its commitment to advancing responsible and sustainable mineral exploration in Peru.

About Camino
Camino is a discovery and development stage copper exploration company. On October 7, 2024, Camino signed a Definitive Agreement to purchase the construction-ready Puquios copper mine in Chile. Camino is focused on developing copper producing assets such as Puquios, and advancing its IOCG Los Chapitos copper project located in Peru through to resource delineation and development, and to add new discoveries. Camino has also permitted the Maria Cecilia copper porphyry project for exploration discovery drilling to add to its NI43-101 resources. In addition, Camino has increased its land position at its copper and silver Plata Dorada project. Camino seeks to acquire a portfolio of advanced copper assets that have the potential to deliver copper into an electrifying copper intensive global economy. For more information, please refer to Camino's website at www.caminocorp.com.

Jose A. Bassan, MSc. Geologist, an independent geologist FAusIMM (CP) 227922, a qualified person as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects, has reviewed and approved the technical contents of this document. Mr. Bassan has reviewed and verified relevant data supporting the technical disclosure, including sampling and analytical test data. Mr. Bassan has verified the data through site visits, inspection of drill core, review of original assay certificates, and confirmation of QA/QC protocols. No limitations were encountered during the verification process, and the data is considered reliable for the purposes of this disclosure.

ON BEHALF OF THE BOARD

For further information, please contact:

/S/ "Jay Chmelauskas"

Camino Investor Relations

President and CEO

[email protected]

Tel: (604) 493-2058

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward Looking Statements: Certain disclosures in this release constitute forward-looking information within the meaning of applicable securities laws. Forward-looking statements are included to provide information about management's current expectations and plans that allows investors and others to have a better understanding of the Company's business plans and financial performance and condition. All statements, other than statements of historical fact included in this release are forward-looking statements that involve risks and uncertainties. Forward-looking information is typically (though not always) identified by words such as "plan", "expect", "estimate", "intend", "anticipate", "believe", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved. In making the forward-looking disclosures in this release, the Company has applied certain factors and assumptions that are based on the Company's current beliefs as well as assumptions made by and information currently available to the Company. Forward-looking information in the release includes, without limitation, statements with respect to a future finance package and construction of Puquios, prospectivity of future exploration work at Los Chapitos, future planned drilling programs, and prospectivity for copper exploration in new targets. Although the Company considers the assumptions underlying such forward-looking information to be reasonable based on information currently available to it, they may prove to be incorrect, and the forward-looking information in this release is subject to numerous risks, uncertainties and other factors that may cause future results to differ materially from those expressed or implied in such forward-looking information. Such risk factors include, among others, that actual results of the Company's exploration activities may be different than those expected by management, that the Company may not realize the benefits of joint ventures and/or strategic partnerships with respect to the Company's properties, that the Company may be unable to obtain or may experience delays in obtaining any required authorizations and approvals and the state of equity and commodity markets. Readers are cautioned not to place undue reliance on forward-looking statements. The Company does not intend, and expressly disclaims any intention or obligation to, update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as required by law.

SOURCE: Camino Minerals Corp



View the original press release on ACCESS Newswire

(P.Werner--BBZ)