Berliner Boersenzeitung - Grande Portage Receives US Forest Service Special Use Permit for Environmental Infrastructure at the New Amalga Gold Project

EUR -
AED 4.343054
AFN 77.464136
ALL 96.578481
AMD 443.001294
ANG 2.116924
AOA 1084.432259
ARS 1696.425045
AUD 1.722632
AWG 2.13043
AZN 2.015092
BAM 1.955364
BBD 2.363473
BDT 143.548016
BGN 1.986001
BHD 0.442401
BIF 3475.425631
BMD 1.182587
BND 1.500966
BOB 8.109193
BRL 6.256361
BSD 1.173439
BTN 107.717999
BWP 16.277373
BYN 3.32206
BYR 23178.695489
BZD 2.360074
CAD 1.622687
CDF 2578.039008
CHF 0.922409
CLF 0.026073
CLP 1029.489324
CNY 8.24689
CNH 8.21806
COP 4228.657801
CRC 580.770597
CUC 1.182587
CUP 31.338542
CVE 110.240437
CZK 24.267271
DJF 208.973438
DKK 7.466899
DOP 73.933527
DZD 153.154875
EGP 55.703589
ERN 17.738798
ETB 182.791072
FJD 2.661179
FKP 0.870315
GBP 0.866681
GEL 3.18162
GGP 0.870315
GHS 12.79115
GIP 0.870315
GMD 86.329235
GNF 10278.709772
GTQ 9.006993
GYD 245.515296
HKD 9.221278
HNL 30.954103
HRK 7.533317
HTG 153.905708
HUF 382.153287
IDR 19840.785951
ILS 3.707232
IMP 0.870315
INR 108.316693
IQD 1537.357457
IRR 49816.456691
ISK 145.777895
JEP 0.870315
JMD 184.718842
JOD 0.838501
JPY 184.146504
KES 151.256298
KGS 103.416722
KHR 4722.947667
KMF 496.686746
KPW 1064.353704
KRW 1710.387141
KWD 0.362349
KYD 0.977982
KZT 590.738376
LAK 25359.349612
LBP 105085.885516
LKR 363.548997
LRD 217.091629
LSL 18.94048
LTL 3.491871
LVL 0.715335
LYD 7.466336
MAD 10.748905
MDL 19.97255
MGA 5308.817127
MKD 61.616271
MMK 2483.187819
MNT 4218.830116
MOP 9.4253
MRU 46.916546
MUR 54.292994
MVR 18.271409
MWK 2034.84661
MXN 20.533372
MYR 4.736855
MZN 75.57955
NAD 18.94048
NGN 1680.526824
NIO 43.180379
NOK 11.555294
NPR 172.348599
NZD 1.987207
OMR 0.454249
PAB 1.173539
PEN 3.936823
PGK 5.018882
PHP 69.733624
PKR 328.342141
PLN 4.208885
PYG 7847.251532
QAR 4.278347
RON 5.101724
RSD 117.373848
RUB 89.207823
RWF 1711.518652
SAR 4.433442
SBD 9.606873
SCR 16.856244
SDG 711.330129
SEK 10.584272
SGD 1.505082
SHP 0.887246
SLE 28.859447
SLL 24798.24684
SOS 669.450838
SRD 45.081425
STD 24477.153012
STN 24.494542
SVC 10.267712
SYP 13078.904017
SZL 18.935781
THB 36.920787
TJS 10.972155
TMT 4.139053
TND 3.416239
TOP 2.847384
TRY 51.246799
TTD 7.971224
TWD 37.116428
TZS 3004.130641
UAH 50.599026
UGX 4148.075755
USD 1.182587
UYU 44.440098
UZS 14242.826515
VES 416.584326
VND 31036.982812
VUV 141.661813
WST 3.258757
XAF 655.810877
XAG 0.011483
XAU 0.000237
XCD 3.196
XCG 2.114929
XDR 0.815618
XOF 655.810877
XPF 119.331742
YER 281.814608
ZAR 19.0597
ZMK 10644.701884
ZMW 23.02187
ZWL 380.792372
  • SCS

    0.0200

    16.14

    +0.12%

  • RBGPF

    -0.8100

    83.23

    -0.97%

  • CMSC

    0.1000

    23.75

    +0.42%

  • NGG

    1.3200

    81.5

    +1.62%

  • BCE

    0.4900

    25.2

    +1.94%

  • RIO

    3.1300

    90.43

    +3.46%

  • CMSD

    0.0900

    24.13

    +0.37%

  • BCC

    -1.1800

    84.33

    -1.4%

  • JRI

    0.0100

    13.68

    +0.07%

  • RELX

    0.0600

    39.9

    +0.15%

  • GSK

    0.5000

    49.15

    +1.02%

  • RYCEF

    0.3000

    17.12

    +1.75%

  • BTI

    0.9400

    59.16

    +1.59%

  • BP

    1.1000

    36.53

    +3.01%

  • AZN

    1.2600

    92.95

    +1.36%

  • VOD

    0.2300

    14.17

    +1.62%

Grande Portage Receives US Forest Service Special Use Permit for Environmental Infrastructure at the New Amalga Gold Project
Grande Portage Receives US Forest Service Special Use Permit for Environmental Infrastructure at the New Amalga Gold Project

Grande Portage Receives US Forest Service Special Use Permit for Environmental Infrastructure at the New Amalga Gold Project

VANCOUVER, BC / ACCESS Newswire / January 7, 2026 / Grande Portage Resources Ltd. (TSXV:GPG)(OTCQB:GPTRF)(FSE:GPB) ("Grande Portage" or the "Company") is pleased to announce an update regarding permitting for its New Amalga Gold property in Southeast Alaska. The current development concept for the project envisions a small-footprint underground mining operation with third-party offsite processing, eliminating the need for an onsite mill or tailings storage facility.

Text size:

On January 5th, the Company received a fully executed Special Use Permit from the US Forest Service (USFS) which authorizes the installation of key long-term infrastructure related to environmental monitoring, including:

  • An environmental data collection station at the expected location of the mine's surface facilities to gather critical meteorological data as necessary for key future permits including an Alaska Department of Conservation Air Quality Control permit and Alaska Pollutant Discharge Elimination System (APDES) permit.

  • Additional meteorological monitoring equipment above the potential future location of underground workings.

  • Stream gauging sensors to understand seasonal fluctuations in river levels and support design of a mine water treatment and handling system which is protective of fish habitat.

  • Satellite uplink communications and power infrastructure necessary for system operation.

Ian Klassen, President and CEO comments: "The receipt of this Special Use Permit is a key step towards gathering all the data necessary to design and permit a low-footprint mining operation which is protective of the surrounding environment. This is an important milestone as it represents the project's first instance of receiving permits for installation of long-term infrastructure at the project site, intended to be utilized not only for preproduction studies but also for ongoing monitoring throughout construction and operation of a future mine facility. We would like to thank our local regulatory officials at the US Forest Service and particularly the USFS staff brought back from furlough for their work advancing this permit during the recent US Federal Government shutdown."

The New Amalga Gold Project remains open to expansion in multiple directions and hosts an Indicated Resource of 1,438,500 ounces of gold at an average grade of 9.47 g/t Au (4,726,000 tonnes) and an Inferred Resource of 515,700 ounces of gold at an average grade of 8.85 g/t Au (1,813,000 tonnes). The current development concept envisions a small-footprint underground mining operation which would transport material offsite for processing by a third party, eliminating the need for an onsite gold recovery plant or tailings storage facility.

This setup is designed to provide several benefits:

  • Eliminates the need to build a gold recovery plant, minimizing mine footprint, power requirements and reducing project construction CAPEX.

  • Eliminates the need to develop a tailings disposal facility at the site, as no tailings would be generated.

  • Removes the need for permanent waste rock storage facilities. Waste rock generated from mine development would be returned to the underground workings as stope backfill.

  • No use of chemical reagents for gold processing at the site.

  • Dramatically reduces land usage and overall environmental footprint.

  • Greatly facilitates post-mining closure and reclamation.

  • Simplifies the environmental review and permitting process.

Project highlights:

  • A 100% interest in the New Amalga Gold Project, located near infrastructure only 25km north of Juneau, Alaska and 6km from paved all-season highway (Fig. 2)

  • The property is host to at least 8 large, long, gold bearing mesothermal veins

  • 240 drill holes from 55 platforms totaling ~65,000 m confirm a large gold-quartz system

  • Past drilling produced multi-ounce assays on several veins. Select samples include:
    Deep Trench Vein: 15.3m grading 37.1 g/t Au, 8.3m grading 58.6 g/t Au, 11.6m grading 28.3 g/t Au
    Goat Vein: 2.1m grading 74.2 g/t Au, 6.3m grading 15.7 g/t Au
    Main Vein: 3.1m grading 79.2 g/t Au, 2.1m grading 37.2 g/t Au, 3.1m grading 13.9 g/t Au
    Ridge Vein: 1.5m grading 43.0 g/t Au, 1.5m grading 29.2 g/t Au
    Sleeping Giant Vein: 2.1m grading 15.4 g/t Au , 3.2m grading 20.7 g/t Au

    See Fig. 1 below for approximate locations of selected intercepts.

  • The Company's updated NI43-101 Mineral Resource Estimate (MRE) with an effective date of July 17, 2024 reported an Indicated Resource of 1,438,500 ounces of gold at an average grade of 9.47 g/t Au (4,726,000 tonnes); and an Inferred Resource of 515,700 ounces of gold at an average grade of 8.85 g/t Au (1,813,000 tonnes), as well as an Indicated Resource of 891,600 ounces of silver at an average grade of 5.86 g/t Ag (4,726,000 tonnes); and an Inferred Resource of 390,600 ounces of silver at an average grade of 7.33 g/t silver (1,813,000 tonnes).

  • The deposit is open to the north, south and at depth.

  • Goat vein surface outcrop channel samples assayed 129.02 g/t gold (3.76 opt) and 290 g/t gold (8.46 opt) with 224 g/t silver (6.53 opt)

  • LiDAR survey of property discovered numerous targets - the first of these tested confirmed gold discovery

  • Received excellent metallurgical recoveries up to 98.2%

  • Completed 6+ years of environmental baseline water sampling

  • Current development strategy envisions a small-footprint underground mining operation with third-party offsite processing, eliminating the need for an onsite mill or tailings storage facility. This configuration reduces capital costs, greatly minimizes the project's environmental footprint, and facilitates permitting.

  • LOI signed with Goldbelt Inc (an Alaska Native Corporation organized under the Alaska Native Claims Settlement Act) for development of an ore export terminal at Cascade Point, Goldbelt's privately-held parcel located only 22km from the project site.

  • NI43-101 Preliminary Economic Assessment in progress, expected completion 2026 Q1.

Fig. 1: Approximate Locations of Selected Intercepts

Fig. 2: Location of the New Amalga Gold Project

Kyle Mehalek, P.E., is the QP within the meaning of NI 43-101 and has reviewed and approved the technical disclosure in this release. Mr. Mehalek is independent of Grande Portage within the meaning of NI 43-101.

About Grande Portage:

Grande Portage Resources Ltd. is a publicly traded mineral exploration company focused on advancing the New Amalga Mine project, the outgrowth of the Herbert Gold discovery situated approximately 25 km north of Juneau, Alaska. The Company holds a 100% interest in the New Amalga property. The New Amalga gold system is open to length and depth and is host to at least six main composite vein-fault structures that contain ribbon structure quartz-sulfide veins. The project lies prominently within the 160km long Juneau Gold Belt, which has produced over eight million ounces of gold.

The Company's updated NI#43-101 Mineral Resource Estimate (MRE) reported at a base case mineral resources cut-off grade of 2.5 grams per tonne gold (g/t Au) and consists of: an Indicated Resource of 1,438,500 ounces of gold at an average grade of 9.47 g/t Au (4,726,000 tonnes); and an Inferred Resource of 515,700 ounces of gold at an average grade of 8.85 g/t Au (1,813,000 tonnes), as well as an Indicated Resource of 891,600 ounces of silver at an average grade of 5.86 g/t Ag (4,726,000 tonnes); and an Inferred Resource of 390,600 ounces of silver at an average grade of 7.33 g/t silver (1,813,000 tonnes). The MRE was prepared by Dr. David R. Webb, Ph.D., P.Geol., P.Eng. (DRW Geological Consultants Ltd.) with an effective date of July 17, 2024.

ON BEHALF OF THE BOARD

"Ian Klassen"
Ian M. Klassen
President & Chief Executive Officer
Tel: (604) 899-0106
Email: [email protected]

For More Information:
Graham Neale
Director, Corporate & External Communications
Tel: (204) 951-0737
Email: [email protected]

Cautionary Statement Regarding Forward-Looking Information

This news release includes certain "forward-looking statements" under applicable Canadian securities legislation. Forward-looking statements include estimates and statements that describe the Company's future plans, objectives or goals, including words to the effect that the Company or management expects a stated condition or result to occur. Forward-looking statements may be identified by such terms as "believes", "anticipates", "expects", "estimates", "may", "could", "would", "will", or "plan". Since forward-looking statements are based on assumptions and address future events and conditions, by their very nature they involve inherent risks and uncertainties as described in the Company's filings with Canadian securities regulators. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

Please note that under National Instrument 43-101, the Company is required to disclose that it has not based any production decision on NI 43-101-compliant reserve estimates, preliminary economic assessments, or feasibility studies, and historically production decisions made without such reports have increased uncertainty and higher technical and economic risks of failure. These risks include, among others, areas that are analyzed in more detail in a feasibility study or preliminary economic assessment, such as the application of economic analysis to mineral resources, more detailed metallurgical and other specialized studies in areas such as mining and recovery methods, market analysis, and environmental, social, and community impacts. Any decision to place the New Amalga Mine into operation at levels intended by management, expand a mine, make other production-related decisions, or otherwise carry out mining and processing operations would be largely based on internal non-public Company data, and on reports based on exploration and mining work by the Company and by geologists and engineers engaged by the Company.

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICE PROVIDER (AS THAT TERM IS DEFINED UNDER THE POLICIES OF THE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS NEWS RELEASE

SOURCE: Grande Portage Resources Limited



View the original press release on ACCESS Newswire

(P.Werner--BBZ)