Berliner Boersenzeitung - Grande Portage Receives US Forest Service Special Use Permit for Environmental Infrastructure at the New Amalga Gold Project

EUR -
AED 4.264247
AFN 74.311769
ALL 94.886725
AMD 427.875417
ANG 2.07889
AOA 1060.246009
ARS 1659.56396
AUD 1.642496
AWG 2.091804
AZN 1.976736
BAM 1.956111
BBD 2.338872
BDT 142.544511
BGN 1.963331
BHD 0.437975
BIF 3471.611904
BMD 1.16113
BND 1.488862
BOB 8.02438
BRL 5.859292
BSD 1.161285
BTN 109.927376
BWP 15.580746
BYN 3.214967
BYR 22758.141333
BZD 2.335512
CAD 1.62337
CDF 2664.791999
CHF 0.921176
CLF 0.026413
CLP 1039.547747
CNY 7.862592
CNH 7.847187
COP 4055.256948
CRC 528.293117
CUC 1.16113
CUP 30.769936
CVE 110.282064
CZK 24.144589
DJF 206.784667
DKK 7.473954
DOP 68.25203
DZD 154.291311
EGP 58.464623
ERN 17.416945
ETB 187.217793
FJD 2.597683
FKP 0.866375
GBP 0.864815
GEL 3.082819
GGP 0.866375
GHS 12.890217
GIP 0.866375
GMD 84.762343
GNF 10172.749236
GTQ 8.852522
GYD 242.95073
HKD 9.096615
HNL 31.05334
HRK 7.533175
HTG 151.776752
HUF 350.621103
IDR 20571.734184
ILS 3.380792
IMP 0.866375
INR 109.857903
IQD 1521.261586
IRR 1597572.177044
ISK 144.606684
JEP 0.866375
JMD 184.069273
JOD 0.823274
JPY 185.974669
KES 150.215376
KGS 101.540995
KHR 4666.822571
KMF 494.641517
KPW 1045.0171
KRW 1757.719493
KWD 0.357895
KYD 0.967771
KZT 568.437745
LAK 25570.396909
LBP 103994.082106
LKR 386.118057
LRD 211.347252
LSL 18.783611
LTL 3.428514
LVL 0.702355
LYD 7.384302
MAD 10.735515
MDL 20.19956
MGA 4824.850425
MKD 61.642149
MMK 2437.315839
MNT 4152.999704
MOP 9.370852
MRU 46.358171
MUR 54.712206
MVR 17.95136
MWK 2013.654925
MXN 19.975026
MYR 4.703043
MZN 74.199814
NAD 18.78353
NGN 1578.184391
NIO 42.737349
NOK 11.056335
NPR 175.884001
NZD 1.988353
OMR 0.446461
PAB 1.1612
PEN 3.949279
PGK 5.085765
PHP 70.05444
PKR 323.081699
PLN 4.245618
PYG 7110.069513
QAR 4.233546
RON 5.236748
RSD 117.350726
RUB 84.210575
RWF 1705.900681
SAR 4.356668
SBD 9.341953
SCR 15.90431
SDG 697.260686
SEK 10.899287
SGD 1.488719
SHP 0.866901
SLE 28.622323
SLL 24348.312657
SOS 663.616969
SRD 43.55339
STD 24033.039647
STN 24.503897
SVC 10.160747
SYP 128.342097
SZL 18.78031
THB 37.790707
TJS 10.764751
TMT 4.075565
TND 3.398511
TOP 2.795722
TRY 53.735635
TTD 7.882389
TWD 36.607518
TZS 3049.710573
UAH 52.061976
UGX 4313.76034
USD 1.16113
UYU 47.098302
UZS 13911.152452
VES 675.728508
VND 30526.098758
VUV 138.756202
WST 3.185551
XAF 656.072639
XAG 0.016371
XAU 0.000268
XCD 3.138011
XCG 2.09286
XDR 0.816711
XOF 656.072639
XPF 119.331742
YER 277.063999
ZAR 18.81801
ZMK 10451.55903
ZMW 20.41351
ZWL 373.883277
  • RBGPF

    0.0000

    60.72

    0%

  • RYCEF

    0.4600

    17.5

    +2.63%

  • AZN

    -3.5300

    178.75

    -1.97%

  • CMSC

    -0.0200

    22.33

    -0.09%

  • GSK

    0.1800

    53.04

    +0.34%

  • RIO

    1.7100

    105.35

    +1.62%

  • BTI

    0.9300

    62.32

    +1.49%

  • BP

    0.1000

    42.78

    +0.23%

  • NGG

    0.3200

    81.84

    +0.39%

  • BCE

    0.0200

    24.59

    +0.08%

  • VOD

    0.2700

    15.53

    +1.74%

  • CMSD

    -0.0400

    22.26

    -0.18%

  • RELX

    0.6300

    33.74

    +1.87%

  • JRI

    -0.0300

    12.8

    -0.23%

  • BCC

    0.4800

    71.14

    +0.67%

Grande Portage Receives US Forest Service Special Use Permit for Environmental Infrastructure at the New Amalga Gold Project
Grande Portage Receives US Forest Service Special Use Permit for Environmental Infrastructure at the New Amalga Gold Project

Grande Portage Receives US Forest Service Special Use Permit for Environmental Infrastructure at the New Amalga Gold Project

VANCOUVER, BC / ACCESS Newswire / January 7, 2026 / Grande Portage Resources Ltd. (TSXV:GPG)(OTCQB:GPTRF)(FSE:GPB) ("Grande Portage" or the "Company") is pleased to announce an update regarding permitting for its New Amalga Gold property in Southeast Alaska. The current development concept for the project envisions a small-footprint underground mining operation with third-party offsite processing, eliminating the need for an onsite mill or tailings storage facility.

Text size:

On January 5th, the Company received a fully executed Special Use Permit from the US Forest Service (USFS) which authorizes the installation of key long-term infrastructure related to environmental monitoring, including:

  • An environmental data collection station at the expected location of the mine's surface facilities to gather critical meteorological data as necessary for key future permits including an Alaska Department of Conservation Air Quality Control permit and Alaska Pollutant Discharge Elimination System (APDES) permit.

  • Additional meteorological monitoring equipment above the potential future location of underground workings.

  • Stream gauging sensors to understand seasonal fluctuations in river levels and support design of a mine water treatment and handling system which is protective of fish habitat.

  • Satellite uplink communications and power infrastructure necessary for system operation.

Ian Klassen, President and CEO comments: "The receipt of this Special Use Permit is a key step towards gathering all the data necessary to design and permit a low-footprint mining operation which is protective of the surrounding environment. This is an important milestone as it represents the project's first instance of receiving permits for installation of long-term infrastructure at the project site, intended to be utilized not only for preproduction studies but also for ongoing monitoring throughout construction and operation of a future mine facility. We would like to thank our local regulatory officials at the US Forest Service and particularly the USFS staff brought back from furlough for their work advancing this permit during the recent US Federal Government shutdown."

The New Amalga Gold Project remains open to expansion in multiple directions and hosts an Indicated Resource of 1,438,500 ounces of gold at an average grade of 9.47 g/t Au (4,726,000 tonnes) and an Inferred Resource of 515,700 ounces of gold at an average grade of 8.85 g/t Au (1,813,000 tonnes). The current development concept envisions a small-footprint underground mining operation which would transport material offsite for processing by a third party, eliminating the need for an onsite gold recovery plant or tailings storage facility.

This setup is designed to provide several benefits:

  • Eliminates the need to build a gold recovery plant, minimizing mine footprint, power requirements and reducing project construction CAPEX.

  • Eliminates the need to develop a tailings disposal facility at the site, as no tailings would be generated.

  • Removes the need for permanent waste rock storage facilities. Waste rock generated from mine development would be returned to the underground workings as stope backfill.

  • No use of chemical reagents for gold processing at the site.

  • Dramatically reduces land usage and overall environmental footprint.

  • Greatly facilitates post-mining closure and reclamation.

  • Simplifies the environmental review and permitting process.

Project highlights:

  • A 100% interest in the New Amalga Gold Project, located near infrastructure only 25km north of Juneau, Alaska and 6km from paved all-season highway (Fig. 2)

  • The property is host to at least 8 large, long, gold bearing mesothermal veins

  • 240 drill holes from 55 platforms totaling ~65,000 m confirm a large gold-quartz system

  • Past drilling produced multi-ounce assays on several veins. Select samples include:
    Deep Trench Vein: 15.3m grading 37.1 g/t Au, 8.3m grading 58.6 g/t Au, 11.6m grading 28.3 g/t Au
    Goat Vein: 2.1m grading 74.2 g/t Au, 6.3m grading 15.7 g/t Au
    Main Vein: 3.1m grading 79.2 g/t Au, 2.1m grading 37.2 g/t Au, 3.1m grading 13.9 g/t Au
    Ridge Vein: 1.5m grading 43.0 g/t Au, 1.5m grading 29.2 g/t Au
    Sleeping Giant Vein: 2.1m grading 15.4 g/t Au , 3.2m grading 20.7 g/t Au

    See Fig. 1 below for approximate locations of selected intercepts.

  • The Company's updated NI43-101 Mineral Resource Estimate (MRE) with an effective date of July 17, 2024 reported an Indicated Resource of 1,438,500 ounces of gold at an average grade of 9.47 g/t Au (4,726,000 tonnes); and an Inferred Resource of 515,700 ounces of gold at an average grade of 8.85 g/t Au (1,813,000 tonnes), as well as an Indicated Resource of 891,600 ounces of silver at an average grade of 5.86 g/t Ag (4,726,000 tonnes); and an Inferred Resource of 390,600 ounces of silver at an average grade of 7.33 g/t silver (1,813,000 tonnes).

  • The deposit is open to the north, south and at depth.

  • Goat vein surface outcrop channel samples assayed 129.02 g/t gold (3.76 opt) and 290 g/t gold (8.46 opt) with 224 g/t silver (6.53 opt)

  • LiDAR survey of property discovered numerous targets - the first of these tested confirmed gold discovery

  • Received excellent metallurgical recoveries up to 98.2%

  • Completed 6+ years of environmental baseline water sampling

  • Current development strategy envisions a small-footprint underground mining operation with third-party offsite processing, eliminating the need for an onsite mill or tailings storage facility. This configuration reduces capital costs, greatly minimizes the project's environmental footprint, and facilitates permitting.

  • LOI signed with Goldbelt Inc (an Alaska Native Corporation organized under the Alaska Native Claims Settlement Act) for development of an ore export terminal at Cascade Point, Goldbelt's privately-held parcel located only 22km from the project site.

  • NI43-101 Preliminary Economic Assessment in progress, expected completion 2026 Q1.

Fig. 1: Approximate Locations of Selected Intercepts

Fig. 2: Location of the New Amalga Gold Project

Kyle Mehalek, P.E., is the QP within the meaning of NI 43-101 and has reviewed and approved the technical disclosure in this release. Mr. Mehalek is independent of Grande Portage within the meaning of NI 43-101.

About Grande Portage:

Grande Portage Resources Ltd. is a publicly traded mineral exploration company focused on advancing the New Amalga Mine project, the outgrowth of the Herbert Gold discovery situated approximately 25 km north of Juneau, Alaska. The Company holds a 100% interest in the New Amalga property. The New Amalga gold system is open to length and depth and is host to at least six main composite vein-fault structures that contain ribbon structure quartz-sulfide veins. The project lies prominently within the 160km long Juneau Gold Belt, which has produced over eight million ounces of gold.

The Company's updated NI#43-101 Mineral Resource Estimate (MRE) reported at a base case mineral resources cut-off grade of 2.5 grams per tonne gold (g/t Au) and consists of: an Indicated Resource of 1,438,500 ounces of gold at an average grade of 9.47 g/t Au (4,726,000 tonnes); and an Inferred Resource of 515,700 ounces of gold at an average grade of 8.85 g/t Au (1,813,000 tonnes), as well as an Indicated Resource of 891,600 ounces of silver at an average grade of 5.86 g/t Ag (4,726,000 tonnes); and an Inferred Resource of 390,600 ounces of silver at an average grade of 7.33 g/t silver (1,813,000 tonnes). The MRE was prepared by Dr. David R. Webb, Ph.D., P.Geol., P.Eng. (DRW Geological Consultants Ltd.) with an effective date of July 17, 2024.

ON BEHALF OF THE BOARD

"Ian Klassen"
Ian M. Klassen
President & Chief Executive Officer
Tel: (604) 899-0106
Email: [email protected]

For More Information:
Graham Neale
Director, Corporate & External Communications
Tel: (204) 951-0737
Email: [email protected]

Cautionary Statement Regarding Forward-Looking Information

This news release includes certain "forward-looking statements" under applicable Canadian securities legislation. Forward-looking statements include estimates and statements that describe the Company's future plans, objectives or goals, including words to the effect that the Company or management expects a stated condition or result to occur. Forward-looking statements may be identified by such terms as "believes", "anticipates", "expects", "estimates", "may", "could", "would", "will", or "plan". Since forward-looking statements are based on assumptions and address future events and conditions, by their very nature they involve inherent risks and uncertainties as described in the Company's filings with Canadian securities regulators. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

Please note that under National Instrument 43-101, the Company is required to disclose that it has not based any production decision on NI 43-101-compliant reserve estimates, preliminary economic assessments, or feasibility studies, and historically production decisions made without such reports have increased uncertainty and higher technical and economic risks of failure. These risks include, among others, areas that are analyzed in more detail in a feasibility study or preliminary economic assessment, such as the application of economic analysis to mineral resources, more detailed metallurgical and other specialized studies in areas such as mining and recovery methods, market analysis, and environmental, social, and community impacts. Any decision to place the New Amalga Mine into operation at levels intended by management, expand a mine, make other production-related decisions, or otherwise carry out mining and processing operations would be largely based on internal non-public Company data, and on reports based on exploration and mining work by the Company and by geologists and engineers engaged by the Company.

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICE PROVIDER (AS THAT TERM IS DEFINED UNDER THE POLICIES OF THE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS NEWS RELEASE

SOURCE: Grande Portage Resources Limited



View the original press release on ACCESS Newswire

(P.Werner--BBZ)