Berliner Boersenzeitung - Grande Portage Resources Receives Approval for 2026 Plan of Operations (Drill Permit) from the US Forest Service

EUR -
AED 4.194308
AFN 72.52041
ALL 93.251191
AMD 420.526993
ANG 2.044792
AOA 1047.866508
ARS 1640.876124
AUD 1.632903
AWG 2.055753
AZN 1.940568
BAM 1.924616
BBD 2.301411
BDT 140.268483
BGN 1.931129
BHD 0.430685
BIF 3415.976235
BMD 1.142085
BND 1.463881
BOB 7.924599
BRL 5.814127
BSD 1.142685
BTN 107.996157
BWP 15.31092
BYN 3.163542
BYR 22384.866
BZD 2.298163
CAD 1.616804
CDF 2649.637338
CHF 0.923553
CLF 0.025703
CLP 1011.613063
CNY 7.717583
CNH 7.762335
COP 3923.061975
CRC 520.466966
CUC 1.142085
CUP 30.265253
CVE 108.897894
CZK 23.757709
DJF 202.971194
DKK 7.350619
DOP 66.926117
DZD 151.759082
EGP 56.999403
ERN 17.131275
ETB 180.877736
FJD 2.551076
FKP 0.852527
GBP 0.866828
GEL 3.020814
GGP 0.852527
GHS 12.902933
GIP 0.852527
GMD 83.371845
GNF 10024.649964
GTQ 8.70995
GYD 239.027087
HKD 8.951674
HNL 30.490468
HRK 7.533873
HTG 149.23202
HUF 343.367446
IDR 20270.409831
ILS 3.373828
IMP 0.852527
INR 107.709463
IQD 1496.13135
IRR 1570366.874934
ISK 141.995464
JEP 0.852527
JMD 180.721797
JOD 0.80976
JPY 183.033967
KES 147.923053
KGS 99.875061
KHR 4582.608142
KMF 485.38591
KPW 1027.8769
KRW 1726.678335
KWD 0.351874
KYD 0.952271
KZT 557.24616
LAK 25160.132326
LBP 102273.711812
LKR 382.810738
LRD 208.030589
LSL 18.495904
LTL 3.37228
LVL 0.690836
LYD 7.280814
MAD 10.558596
MDL 19.939917
MGA 4796.756942
MKD 60.629453
MMK 2398.316589
MNT 4087.958667
MOP 9.219419
MRU 45.774818
MUR 53.826741
MVR 17.656913
MWK 1982.659854
MXN 19.87116
MYR 4.642352
MZN 72.981636
NAD 18.503966
NGN 1552.230167
NIO 41.811846
NOK 11.158684
NPR 172.792757
NZD 1.994455
OMR 0.43913
PAB 1.142685
PEN 3.897377
PGK 5.011184
PHP 68.951108
PKR 317.840185
PLN 4.165949
PYG 6973.017439
QAR 4.157763
RON 5.147419
RSD 115.431735
RUB 83.339709
RWF 1699.42248
SAR 4.284982
SBD 9.206832
SCR 16.12067
SDG 685.82127
SEK 10.995541
SGD 1.464187
SHP 0.852682
SLE 28.266937
SLL 23948.955593
SOS 652.710174
SRD 42.636347
STD 23638.85364
STN 24.440619
SVC 9.99809
SYP 126.237051
SZL 18.498214
THB 37.157165
TJS 10.59257
TMT 4.008718
TND 3.325466
TOP 2.749867
TRY 53.042608
TTD 7.76223
TWD 36.042492
TZS 2997.976517
UAH 51.17556
UGX 4227.502529
USD 1.142085
UYU 46.13292
UZS 13710.730262
VES 680.724228
VND 30066.52971
VUV 135.895439
WST 3.129029
XAF 645.498109
XAG 0.017975
XAU 0.000276
XCD 3.086542
XCG 2.059414
XDR 0.803682
XOF 645.27823
XPF 119.331742
YER 272.530062
ZAR 18.866359
ZMK 10280.138245
ZMW 20.196756
ZWL 367.750904
  • CMSC

    0.0500

    22.37

    +0.22%

  • NGG

    -1.2400

    79.44

    -1.56%

  • CMSD

    0.0000

    22.29

    0%

  • RBGPF

    -0.5300

    60.61

    -0.87%

  • RYCEF

    -0.0300

    18.4

    -0.16%

  • RELX

    -0.8300

    31.18

    -2.66%

  • VOD

    -0.2300

    14.3

    -1.61%

  • BCE

    0.0000

    23.28

    0%

  • RIO

    -2.5900

    100.08

    -2.59%

  • BCC

    3.8500

    74.66

    +5.16%

  • JRI

    0.0500

    12.67

    +0.39%

  • AZN

    -2.9600

    174.93

    -1.69%

  • GSK

    -1.4800

    50.67

    -2.92%

  • BP

    -1.0400

    39.1

    -2.66%

  • BTI

    -0.5800

    58.91

    -0.98%

Grande Portage Resources Receives Approval for 2026 Plan of Operations (Drill Permit) from the US Forest Service
Grande Portage Resources Receives Approval for 2026 Plan of Operations (Drill Permit) from the US Forest Service

Grande Portage Resources Receives Approval for 2026 Plan of Operations (Drill Permit) from the US Forest Service

VANCOUVER, BC / ACCESS Newswire / January 20, 2026 / Grande Portage Resources Ltd. (TSXV:GPG)(OTCQB:GPTRF)(FSE:GPB) ("Grande Portage" or the "Company") is pleased to announce that it has received a letter of approval for its 2026 Plan of Operations (drill permit) from the US Forest Service for upcoming drilling and fieldwork at the New Amalga Gold property in Southeast Alaska.

Text size:

The program planned for 2026 includes up to 4,300 meters of diamond drilling from up to 14 drillholes, as well as installation of instrumentation, surface mapping, and trench sampling. The drillholes will provide additional definition to upgrade resource classification in key areas of the deposit and will characterize the geotechnical and hydrogeological aspects of the rock mass in order gather data necessary for the environmental review and permitting process as well as to inform mine development plans.

The geotechnical and hydrogeological characterization work will include:

  • Detailed geotechnical logging to define the rock conditions in areas of key underground infrastructure,

  • Installation of piezometers in select drillholes to measure groundwater levels and pressures, and

  • Packer testing, which involves pumping pressurized water into a drillhole to determine the hydraulic conductivity or permeability of the rock structures intersected by the hole

The Company is currently in the process of evaluating proposals from drilling contractors, with the scope of work planned to be awarded in the coming weeks. Drilling work is expected to begin in late June in line with the permit conditions.

Ian Klassen, President and CEO comments: "The U.S. Forest Service's approval of the 2026 drill plan marks an important advancement for the New Amalga project as it moves beyond solely exploration and into the development planning phase. The upcoming drilling program will generate key geotechnical and hydrogeological datasets required for engineering analysis and environmental evaluation. These activities are fundamental to progressing the project through regulatory review and toward mine development."

Project Summary:

The New Amalga Gold Project is located only 25km from Alaska's capital city of Juneau and 6km from paved highway. The resource remains open to expansion in multiple directions and hosts an Indicated Resource of 1,438,500 ounces of gold at an average grade of 9.47 g/t Au (4,726,000 tonnes) and an Inferred Resource of 515,700 ounces of gold at an average grade of 8.85 g/t Au (1,813,000 tonnes) (with an effective date of July 17, 2024).

The current development concept envisions a small-footprint underground mining operation which would transport material offsite for processing by a third party, eliminating the need for an onsite gold recovery plant or tailings storage facility.

This setup is designed to provide several benefits:

  • Eliminates the need to build a gold recovery plant, minimizing mine footprint, power requirements and reducing project construction CAPEX.

  • Eliminates the need to develop a tailings disposal facility at the site, as no tailings would be generated.

  • Removes the need for permanent waste rock storage facilities. Waste rock generated from mine development would be returned to the underground workings as stope backfill.

  • No use of chemical reagents for gold processing at the site.

  • Dramatically reduces land usage and overall environmental footprint.

  • Greatly facilitates post-mining closure and reclamation.

  • Simplifies the environmental review and permitting process.

Project Highlights:

  • A 100% interest in the New Amalga Gold Project, located near infrastructure only 25km north of Juneau, Alaska and 6km from paved all-season highway (Fig. 2)

  • The property is host to at least 8 large, long, gold bearing mesothermal veins

  • 240 drill holes from 55 platforms totaling ~65,000 m confirm a large gold-quartz system

  • Past drilling produced multi-ounce assays on several veins. Select samples include:

    Deep Trench Vein: 15.3m grading 37.1 g/t Au, 8.3m grading 58.6 g/t Au, 11.6m grading 28.3 g/t Au
    Goat Vein: 2.1m grading 74.2 g/t Au, 6.3m grading 15.7 g/t Au
    Main Vein: 3.1m grading 79.2 g/t Au, 2.1m grading 37.2 g/t Au, 3.1m grading 13.9 g/t Au
    Ridge Vein: 1.5m grading 43.0 g/t Au, 1.5m grading 29.2 g/t Au
    Sleeping Giant Vein: 2.1m grading 15.4 g/t Au, 3.2m grading 20.7 g/t Au

See Fig. 1 below for approximate locations of selected intercepts.

  • The Company's updated NI43-101 Mineral Resource Estimate (MRE) with an effective date of July 17, 2024 reported an Indicated Resource of 1,438,500 ounces of gold at an average grade of 9.47 g/t Au (4,726,000 tonnes); and an Inferred Resource of 515,700 ounces of gold at an average grade of 8.85 g/t Au (1,813,000 tonnes), as well as an Indicated Resource of 891,600 ounces of silver at an average grade of 5.86 g/t Ag (4,726,000 tonnes); and an Inferred Resource of 390,600 ounces of silver at an average grade of 7.33 g/t silver (1,813,000 tonnes).

  • The deposit is open to the north, south and at depth.

  • Goat vein surface outcrop channel samples assayed 129.02 g/t gold (3.76 opt) and 290 g/t gold (8.46 opt) with 224 g/t silver (6.53 opt)

  • LiDAR survey of property discovered numerous targets - the first of these tested confirmed gold discovery

  • Received excellent metallurgical recoveries up to 98.2%

  • Completed 6+ years of environmental baseline water sampling

  • Current development strategy envisions a small-footprint underground mining operation with third-party offsite processing, eliminating the need for an onsite mill or tailings storage facility. This configuration reduces capital costs, greatly minimizes the project's environmental footprint, and facilitates permitting.

  • LOI signed with Goldbelt Inc (an Alaska Native Corporation organized under the Alaska Native Claims Settlement Act) for development of an ore export terminal at Cascade Point, Goldbelt's privately held parcel located only 22km from the project site.

  • NI43-101 Preliminary Economic Assessment in progress, expected completion 2026 Q1.

Fig. 1: Approximate Locations of Selected Intercepts

Fig. 2: Location of the New Amalga Gold Project

Fig. 3: Example of Drill Station from Previous Exploration Season at the Project Site

Kyle Mehalek, P.E.., is the QP within the meaning of NI 43-101 and has reviewed and approved the technical disclosure in this release. Mr. Mehalek is independent of Grande Portage within the meaning of NI 43-101.

About Grande Portage:

Grande Portage Resources Ltd. is a publicly traded mineral exploration company focused on advancing the New Amalga Mine project, the outgrowth of the Herbert Gold discovery situated approximately 25 km north of Juneau, Alaska. The Company holds a 100% interest in the New Amalga property. The New Amalga gold system is open to length and depth and is host to at least six main composite vein-fault structures that contain ribbon structure quartz-sulfide veins. The project lies prominently within the 160km long Juneau Gold Belt, which has produced over eight million ounces of gold.

The Company's updated NI#43-101 Mineral Resource Estimate (MRE) reported at a base case mineral resources cut-off grade of 2.5 grams per tonne gold (g/t Au) and consists of: an Indicated Resource of 1,438,500 ounces of gold at an average grade of 9.47 g/t Au (4,726,000 tonnes); and an Inferred Resource of 515,700 ounces of gold at an average grade of 8.85 g/t Au (1,813,000 tonnes), as well as an Indicated Resource of 891,600 ounces of silver at an average grade of 5.86 g/t Ag (4,726,000 tonnes); and an Inferred Resource of 390,600 ounces of silver at an average grade of 7.33 g/t silver (1,813,000 tonnes). The MRE was prepared by Dr. David R. Webb, Ph.D., P.Geol., P.Eng. (DRW Geological Consultants Ltd.) with an effective date of July 17, 2024. Additional information on the New Amalga Mine project is available in the technical report titled "Technical Report of the Herbert Gold Property, Juneau District, Southeast Alaska" dated July 17, 2024, which is available under Grande Portage's SEDAR+ profile at www.sedarplus.ca.

ON BEHALF OF THE BOARD

"Ian Klassen"
Ian M. Klassen
President & Chief Executive Officer
Tel: (604) 899-0106
Email: [email protected]

Cautionary Statement Regarding Forward-Looking Information

This news release includes certain "forward-looking statements" under applicable Canadian securities legislation. Forward-looking statements include estimates and statements that describe the Company's future plans, objectives or goals, including words to the effect that the Company or management expects a stated condition or result to occur. Forward-looking statements may be identified by such terms as "believes", "anticipates", "expects", "estimates", "may", "could", "would", "will", or "plan". Forward-looking statements or information contained in this release include, but are not limited to, statements or information with respect to: plans regarding the New Amalga Mine Project, including upcoming drilling and fieldwork, including timing thereof, expected results of diamond drilling, upcoming geotechnical and hydrogeological characterization work, including timing thereof, engagement of drilling contractors, expectations regarding the New Amalga Mine project, including the Company's mineral resources, the development concept and benefits thereof, results from drilling and interpretations thereof, and timing of a preliminary economic assessment. Since forward-looking statements are based on assumptions and address future events and conditions, by their very nature they involve inherent risks and uncertainties as described in the Company's filings with Canadian securities regulators. These risks, uncertainties and other factors include, among others, ability to engage drilling contractors, including ability to negotiate terms reasonable to the Company, uncertainty regarding results of the drilling program, and risks associated with the exploration and development of the New Amalga Mine and our mineral resources. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

Please note that under National Instrument 43-101, the Company is required to disclose that it has not based any production decision on NI 43-101-compliant reserve estimates, preliminary economic assessments, or feasibility studies, and historically production decisions made without such reports have increased uncertainty and higher technical and economic risks of failure. These risks include, among others, areas that are analyzed in more detail in a feasibility study or preliminary economic assessment, such as the application of economic analysis to mineral resources, more detailed metallurgical and other specialized studies in areas such as mining and recovery methods, market analysis, and environmental, social, and community impacts. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Any decision to place the New Amalga Mine into operation at levels intended by management, expand a mine, make other production-related decisions, or otherwise carry out mining and processing operations would be largely based on internal non-public Company data, and on reports based on exploration and mining work by the Company and by geologists and engineers engaged by the Company.

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICE PROVIDER (AS THAT TERM IS DEFINED UNDER THE POLICIES OF THE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS NEWS RELEASE

SOURCE: Grande Portage Resources Limited



View the original press release on ACCESS Newswire

(F.Schuster--BBZ)