Berliner Boersenzeitung - Camino Corporation Commences Drilling at Costa de Cobre District-Scale IOCG Copper Discovery in Peru

EUR -
AED 4.177857
AFN 75.655231
ALL 93.77151
AMD 415.873647
AOA 1043.183623
ARS 1703.139744
AUD 1.632144
AWG 2.047688
AZN 1.938444
BAM 1.955206
BBD 2.292004
BDT 140.367353
BHD 0.42917
BIF 3399.667097
BMD 1.137604
BND 1.468954
BOB 12.637161
BRL 5.783017
BSD 1.137954
BTN 109.829631
BWP 15.719224
BYN 3.264008
BYR 22297.045604
BZD 2.288705
CAD 1.60408
CDF 2570.986282
CHF 0.931214
CLF 0.027331
CLP 1075.683181
CNY 7.703975
CNH 7.703527
COP 3641.493624
CRC 517.842667
CUC 1.137604
CUP 30.146516
CVE 110.231509
CZK 24.15874
DJF 202.638433
DKK 7.478957
DOP 66.269866
DZD 151.755893
EGP 58.441244
ERN 17.064066
ETB 183.671796
FJD 2.561093
FKP 0.854706
GBP 0.854089
GEL 2.986257
GGP 0.854706
GHS 13.233979
GIP 0.854706
GMD 84.183128
GNF 9983.966623
GTQ 8.681362
GYD 238.077666
HKD 8.921265
HNL 30.479739
HRK 7.538112
HTG 148.784795
HUF 361.246708
IDR 20388.145475
ILS 3.465542
IMP 0.854706
INR 109.855614
IQD 1490.261721
IRR 1564206.005764
ISK 143.114968
JEP 0.854706
JMD 180.495161
JOD 0.806606
JPY 186.402209
KES 147.365227
KGS 99.483939
KHR 4601.601919
KMF 493.720694
KRW 1660.413643
KWD 0.352749
KYD 0.948312
KZT 541.065611
LAK 25767.171293
LBP 101903.839083
LKR 382.413813
LRD 205.967422
LSL 19.146315
LTL 3.35905
LVL 0.688126
LYD 7.281788
MAD 10.650825
MDL 20.112889
MGA 5042.467973
MKD 61.556298
MMK 2389.220422
MNT 4089.366147
MOP 9.191907
MRU 45.561486
MUR 53.957006
MVR 17.576418
MWK 1976.019179
MXN 19.890107
MYR 4.654399
MZN 72.697161
NAD 19.14631
NGN 1553.403001
NIO 41.877277
NOK 10.89723
NPR 175.72761
NZD 1.971414
OMR 0.437597
PAB 1.137954
PEN 3.870703
PGK 5.090453
PHP 70.173169
PKR 316.095262
PLN 4.3192
PYG 6879.909713
QAR 4.145601
RON 5.218476
RSD 117.354345
RUB 88.93298
RWF 1676.790549
SAR 4.282815
SBD 9.1931
SCR 16.541191
SDG 683.135604
SEK 11.056268
SGD 1.46825
SLE 27.558509
SOS 650.145062
SRD 42.992917
STD 23546.113594
STN 24.492559
SVC 9.956975
SZL 19.146301
THB 38.342998
TJS 10.497611
TMT 3.981615
TND 3.370887
TRY 53.857039
TTD 7.731651
TWD 36.813295
TZS 3004.187253
UAH 50.997906
UGX 4289.696684
USD 1.137604
UYU 45.696116
UZS 13771.81578
VES 843.307715
VND 29941.746954
VUV 134.790696
WST 3.123527
XAF 655.757765
XAG 0.019523
XAU 0.000281
XCD 3.074433
XCG 2.050877
XDR 0.815552
XOF 655.757765
XPF 119.331742
YER 271.375935
ZAR 19.150778
ZMK 10239.808511
ZMW 21.080595
ZWL 366.308142
  • CMSC

    -0.0650

    21.725

    -0.3%

  • BCC

    1.3800

    77.84

    +1.77%

  • JRI

    0.1600

    13.06

    +1.23%

  • RYCEF

    -0.1900

    18.17

    -1.05%

  • RBGPF

    -0.7300

    66

    -1.11%

  • BCE

    0.0900

    21.3

    +0.42%

  • RIO

    -0.2900

    91.22

    -0.32%

  • CMSD

    -0.0200

    21.98

    -0.09%

  • BTI

    1.1200

    60.96

    +1.84%

  • GSK

    0.6100

    51.35

    +1.19%

  • VOD

    -0.1000

    15.15

    -0.66%

  • NGG

    -0.0700

    82.3

    -0.09%

  • RELX

    1.5500

    34.41

    +4.5%

  • BP

    -0.1100

    43.82

    -0.25%

  • AZN

    0.9900

    169.26

    +0.58%

Camino Corporation Commences Drilling at Costa de Cobre District-Scale IOCG Copper Discovery in Peru
Camino Corporation Commences Drilling at Costa de Cobre District-Scale IOCG Copper Discovery in Peru

Camino Corporation Commences Drilling at Costa de Cobre District-Scale IOCG Copper Discovery in Peru

VANCOUVER, BC / ACCESS Newswire / April 16, 2026 / Camino Minerals Corporation (TSXV:COR)(OTC PINK:CAMZF) ("Camino" or the "Company") is pleased to announce the commencement of a drilling campaign at its Costa de Cobre district-scale IOCG copper discovery in Peru ("Costa de Cobre" or "Copper Coast"), previously referred to as the Los Chapitos copper project(1). Camino has rebranded the Los Chapitos project as the Costa de Cobre, the Copper Coast, to better reflect its low-elevation coastal setting and strategic proximity to key infrastructure, including the proposed San Juan de Marcona Port Terminal, a major new port facility planned approximately 125 km to the north at Marcona. The Costa de Cobre project is advancing to the next stage of exploration and development as the Company enters into a joint venture with Nittetsu Mining Co., Ltd.("Nittetsu"), under which Camino will serve as operator and hold a 65% interest, while Nittetsu will hold the remaining 35% interest. Camino is also developing the permitted Puquios copper mine in Chile in a 50/50 Joint Venture partnership with Nittetsu targeting a finance package and construction commencement in mid-2026.

Text size:

The district in which Costa de Cobre is located hosts one of the world's newest large scale copper mines, Mina Justa, and includes copper exploration claims held by major mining companies, such as Rio Tinto and subsidiaries of Antofogasta PLC, and major iron ore projects, Pampa de Pongo and Marcona. The presence of nearby operating mines and exploration projects is strictly for regional context and is not necessarily indicative of mineralization on the Costa de Cobre Project; production at nearby operating mines is not indicative that the Company will achieve similar results.

Photo 1. Drilling commences at the Mirador target at the Costa de Cobre copper project.

Camino has completed over 28,000 metres of drilling at Costa de Cobre at multiple discovery locations and in recently released the results of the initial phase of the drilling campaign (see news release dated February 17, 2026) including a notable intersection of 83.5 m @ 0.94% Cu & 10.40 g/t Ag, including 7.1 m @ 2.13% Cu and 34.36 g/t Ag, reinforcing the high-grade potential of near-surface mineralization with clear upside towards a sulphide system at depth. The drilling results referenced are from Camino's previously completed exploration programs and should not be interpreted as representative of mineral resources or mineral reserves.

Following multiple successful exploration campaigns, Camino is targeting large-scale copper mineralization along major structural corridors, including the Diva and La Estancia fault systems, which extend over 8 km and 12 km, respectively. These regional structures are interpreted as primary conduits for hydrothermal fluids and copper deposition, which enhance the scale of the project. Recent drilling and surface programs have confirmed the presence of extensive copper oxide mineralization associated with hydrothermal breccias and manto-style bodies.

"The current drilling campaign is expected to include approximately 1,100 meters of drilling, focused on the copper oxide in the first 100 m and sulphide at depth in Diva and La Estancia fault, and is aimed at expanding known mineralized zones and testing high-priority structural corridors. This next phase of drilling is designed to further define copper mineralization at Costa de Cobre," stated Orlando Pariona, Chief Geologist of Camino, Peru

Figure 1. Location of the claims at Costa de Cobre 2026 and neighbours.

Coastal Advantage and Access to Markets

The proposed San Juan de Marcona Port represents a significant strategic advantage for Camino's Costa de Cobre copper project and the overall mining sector in southern Peru. Located approximately 125 km from Costa de Cobre, with direct access via the Panamericana Sur, the new mining-focused port is expected to improve logistics and efficiency by reducing transport distances and lowering costs for copper production exports in the area. With planned capacity of up to 47 million tonnes per year and infrastructure designed to handle bulk mineral shipments, the port may increase the economic viability of development-stage projects by improving operating margins and project NPV. The proposed port project could enable mining growth in the region, providing further investment potential and strengthening Peru's position as a globally competitive copper producer.

About Camino

Camino is a discovery and development stage copper exploration company. The Company has entered into a joint venture partnership with Nittetsu Mining Co., Ltd. To advance the construction-ready Puquios copper project in Chile toward development and production. Camino is advancing its IOCG Costa de Cobre copper project located in Peru through to resource delineation and development, and to add new discoveries. Camino has also permitted the Maria Cecilia copper porphyry project for exploration discovery drilling to add to its NI43-101 resources. In addition, Camino has increased its land position at its copper and silver Plata Dorada project. Camino seeks to acquire a portfolio of advanced copper assets that have the potential to deliver copper into an electrifying copper intensive global economy. For more information, please refer to Camino's website at www.caminocorp.com.

Jose A. Bassan, MSc. Geologist, an independent geologist FAusIMM (CP) 227922, a qualified person as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects, has reviewed and approved the technical contents of this document. Mr. Bassan has reviewed and verified relevant data supporting the technical disclosure, including sampling and analytical test data.

ON BEHALF OF THE BOARD
/S/ "Jay Chmelauskas"
President and CEO

For further information, please contact:
Camino Investor Relations
[email protected]
Tel: (604) 493-2058

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.  

Cautionary Note Regarding Forward Looking Statements: Certain disclosures in this release constitute forward-looking information. In making the forward-looking disclosures in this release, the Company has applied certain factors and assumptions that are based on the Company's current beliefs as well as assumptions made by and information currently available to the Company. Forward-looking information in the release includes, without limitation, statements with respect to the prospectivity of future exploration work at Costa de Cobre, future planned drilling programs, the interpretation of geological models, the potential continuity and extent of mineralized systems, the continuation of drilling with future campaigns, and the prospectivity for copper exploration in new targets. Although the Company considers these assumptions to be reasonable based on information currently available to it, they may prove to be incorrect, and the forward-looking information in this release is subject to numerous risks, uncertainties and other factors that may cause future results to differ materially from those expressed or implied in such forward-looking information. Such risk factors include, among others, that actual results of the Company's exploration activities may be different than those anticipated by management; that geological interpretations, including the continuity or extent of mineralized bodies, may change with additional drilling; that the Company may not realize the benefits of joint ventures and/or strategic partnerships; that the Company may be unable to obtain or may experience delays in obtaining required permits, authorizations and approvals; operational and technical risks inherent in exploration; risks related to third‑party infrastructure development and timing, including the proposed San Juan de Marcona Port; and risks related to the state of equity and commodity markets. Readers are cautioned not to place undue reliance on forward-looking statements. The Company does not intend, and expressly disclaims any intention or obligation to, update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as required by law.

SOURCE: Camino Minerals Corp



View the original press release on ACCESS Newswire

(L.Kaufmann--BBZ)