Berliner Boersenzeitung - GMV Minerals Announces Drilling Update

EUR -
AED 4.029739
AFN 70.778474
ALL 89.669173
AMD 395.464045
ANG 1.96456
AOA 1007.296808
ARS 1720.666958
AUD 1.64558
AWG 1.977834
AZN 1.86972
BAM 1.955128
BBD 2.206341
BDT 136.253158
BGN 1.945981
BHD 0.413358
BIF 3299.465689
BMD 1.097273
BND 1.413214
BOB 12.789603
BRL 6.528229
BSD 1.095423
BTN 101.462119
BWP 15.618631
BYN 3.288669
BYR 21506.546342
BZD 2.203143
CAD 1.574203
CDF 2501.782318
CHF 0.922196
CLF 0.028442
CLP 1116.636116
CNY 7.327314
CNH 7.332859
COP 3761.106983
CRC 490.331431
CUC 1.097273
CUP 26.290962
CVE 110.227105
CZK 24.468858
DJF 195.072937
DKK 7.47781
DOP 66.08728
DZD 149.391641
EGP 58.61085
ERN 16.459092
ETB 179.797988
FJD 2.514456
FKP 0.837372
GBP 0.838894
GEL 2.857146
GGP 0.837372
GHS 12.898566
GIP 0.837372
GMD 81.198575
GNF 9711.661263
GTQ 8.373121
GYD 229.181211
HKD 8.601467
HNL 29.444877
HRK 7.496529
HTG 143.650615
HUF 373.391377
IDR 20072.355965
ILS 3.666044
IMP 0.837372
INR 101.695794
IQD 1660.729064
IRR 2125817.320551
ISK 137.28022
JEP 0.837372
JMD 173.530343
JOD 0.77801
JPY 173.978128
KES 142.461024
KGS 95.956926
KHR 4469.463459
KMF 492.675859
KPW 987.545879
KRW 1476.824954
KWD 0.342108
KYD 0.912886
KZT 499.698211
LAK 24694.510363
LBP 98101.274117
LKR 364.304757
LRD 183.48692
LSL 19.148917
LTL 3.239962
LVL 0.66373
LYD 7.087563
MAD 10.954734
MDL 20.079097
MGA 4964.293344
MKD 61.533846
MMK 2304.446613
MNT 3958.888254
MOP 8.844159
MRU 44.651649
MUR 51.330836
MVR 16.902103
MWK 1899.546962
MXN 21.022046
MYR 4.513125
MZN 70.119822
NAD 19.148917
NGN 1486.804984
NIO 40.31614
NOK 10.711083
NPR 162.33919
NZD 2.006534
OMR 0.418806
PAB 1.095423
PEN 3.760307
PGK 4.931305
PHP 70.245251
PKR 302.809298
PLN 4.459811
PYG 6907.625252
QAR 4.004323
RON 5.352281
RSD 117.589574
RUB 89.402865
RWF 1618.343635
SAR 4.116755
SBD 8.914258
SCR 15.355277
SDG 660.013606
SEK 11.223898
SGD 1.414828
SHP 0.838605
SLE 25.07309
SLL 23009.265425
SOS 626.084761
SRD 40.997955
STD 22711.331007
STN 24.49158
SVC 9.584705
SYP 14266.740959
SZL 19.144418
THB 37.356693
TJS 10.072637
TMT 3.840455
TND 3.318059
TOP 2.64197
TRY 55.454853
TTD 7.435444
TWD 36.176649
TZS 2922.095423
UAH 49.196787
UGX 4628.408816
USD 1.097273
UYU 44.544686
UZS 13114.491416
VES 1006.876973
VND 28311.283441
VUV 133.341659
WST 3.097951
XAF 655.957
XAG 0.026772
XAU 0.000311300718
XCD 2.965435
XCG 1.974321
XDR 0.775829
XOF 655.957
XPF 119.331742
YER 259.618676
ZAR 19.332389
ZMK 9876.775613
ZMW 22.555246
ZWL 353.321385
SSP 6338.3417
MXV 2.356505
  • CMSD

    -0.1200

    19.81

    -0.61%

  • JRI

    0.0000

    10.77

    0%

  • BCC

    -1.8200

    74.15

    -2.45%

  • CMSC

    -0.2228

    19.53

    -1.14%

  • BCE

    0.2000

    20.34

    +0.98%

  • RIO

    0.0100

    94.17

    +0.01%

  • AZN

    -2.7400

    161.47

    -1.7%

  • GSK

    -1.1800

    48.17

    -2.45%

  • RBGPF

    0.0000

    65

    0%

  • NGG

    0.8800

    75.82

    +1.16%

  • RYCEF

    -0.7300

    19.08

    -3.83%

  • BTI

    -0.4500

    54.4

    -0.83%

  • BP

    0.4700

    43.99

    +1.07%

  • RELX

    -0.0600

    33.18

    -0.18%

  • VOD

    -0.1800

    16.15

    -1.11%

GMV Minerals Announces Drilling Update
GMV Minerals Announces Drilling Update

GMV Minerals Announces Drilling Update

Drilling 10th Hole at the Mexican Hat Gold Project

Text size:

VANCOUVER, BC / ACCESS Newswire / June 1, 2026 / GMV Minerals Inc. (the "Company" or "GMV") (TSXV:GMV)(OTCQB:GMVMF) is pleased to announce that drilling is proceeding well. The Company is now drilling its 10th diamond drill hole on its wholly-owned Mexican Hat Deposit in Cochise County, Arizona, totalling 1,996 m to date. These have been completed over 430m of strike length.

As anticipated, all holes drilled to date have intersected mineralization. A total of 20-25 drill holes are currently planned (up to 4,925 m) with some drill hole additions or reductions possible as determined during the program. Recoveries have been very good. Assays will be reported as they are received, verified, and approved for release by the QP.

A total of 599 samples (from the first 5 holes) have been submitted for analysis to SGS USA Inc. in Tempe Arizona, an independent qualified laboratory. Samples are submitted in batches of >100 samples +/- as logging is completed with results being returned from the lab as they come available. All samples are tested for gold by fire assay with automatic overlimits applied to samples exceeding 10 gpt gold. Additional testing for selected samples to confirm geochemical trends is determined by the logging crew together with selected SG analyses. Certified blanks and standards with field duplicates are submitted at predetermined intervals, and these together with laboratory blanks, standards and duplicate analyses are examined to confirm QA/QC.

This drilling will test approximately 90% of the mineralization providing confirmation of grade distribution allowing for the Inferred Mineral Resource to be confirmed and potentially be upgraded, and to collect geotechnical information to assist in modelling of the open pit.

2025 PEA Highlights:

The Company filed the PEA (as defined below) on September 8, 2025, which included that following highlights:

  • The Base Case generates a pre-tax Internal Rate of Return ("IRR") of 66.1% (after-tax 50.2%) and a pre-tax net present value ("NPV") at a 5% discount rate of US$390.2 million (after-tax US$268.3 million) with a 1.53-year payback (1.82 year after-tax) of invested capital using a US$2,500 per ounce gold price.

  • Based on price sensitivity analysis at a more current price range of US$4,000 per ounce of gold, the project returns a pre-tax IRR of 134.2% (after-tax 104.2%) and a pre-tax NPV at a 5% discount rate of US$1.055 billion (after-tax US$744.4 million).

  • Base Case mine life of 10 years with total production of 597,841 ounces, averaging approximately 60,000 ounces per year.

  • Crushed mineralized material will be conveyor stacked at a rate of approximately 10,000 tonnes/day on a conventional heap leach pad.

  • Capex: US$89,997,000 (including US$15.4 million contingency).

  • Low LOM Strip Ratio of 2.05

  • Engineering design analysis indicates the potential to increase pit size and contained ounces with increased gold prices.

Technical Report and Qualified Persons

The technical report entitled "Updated Preliminary Economic Assessment, Mexican Hat Project" (the "PEA"), with an effective date of August 8, 2025 was prepared by the following Qualified Persons (as defined under NI 43-101), all of whom are independent of the Company:

  • Mr. Brian Olson, Q.P., Samuel Engineering, Inc. (Metallurgical Test Work and Recovery, Process Plant and Process Operating Costs)

  • Mr. Steven Pozder, P.E., Samuel Engineering, Inc. (Project Economics and Infrastructure)

  • Dr. Dave Webb, Ph.D., P.Eng., P.Geo., DRW Geological Consultants Ltd. (Mineral Resource Estimate, Mineral Reserve Estimate, Property Description and Location, Accessibility, Climate, Local Resource, Infrastructure and Physiography, History, Geological Setting and Mineralization, Deposit Types, Exploration, Drilling, Sample Preparation, Analysis and Security, Data Verification).

  • Mr. Thomas L. Dyer, P.E., RESPEC LLC. (Mine Design, Production Schedule, Capital and Operating Costs)

  • Mr. Francisco J. Barrios, P.E., BBA Consultants International LP (Pad Design and Loading)

  • Ms. Dawn Garcia, CPG, PG, Stantec Consulting Services Inc. (Environmental)

Technical Information and Cautionary Note Regarding Inferred Mineral Resources

The mine plan evaluated in the PEA is preliminary in nature and includes Inferred Mineral Resources, as defined by NI 43-101 that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be converted to Mineral Reserves. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. Additional drilling and technical studies will need to be completed in order to fully assess its viability. There is no certainty that a production decision will be made to develop the Mexican Hat Project or that the economic results described in the PEA will be realized. Mine design and mining schedules, metallurgical flow sheets and process plant designs will require additional detailed work and economic analysis and internal studies to ensure satisfactory operational conditions and decisions regarding future targeted production. Key assumptions, qualifications and estimates to the results of the PEA are contained in the PEA.

About GMV Minerals Inc.

GMV Minerals Inc. is a publicly traded exploration company focused on developing precious metal assets in Arizona. GMV, through its 100% owned subsidiary, has a 100% interest in a Mining Property Lease commonly referred to as the Mexican Hat Property, located in Cochise County, Arizona, USA. The project was initially explored by Placer Dome (USA) in the late 1980's to early 1990's. GMV is focused on developing the asset and realizing the full mineral potential of the property through near term gold production. The Company's NI 43-101 resource estimate (Inferred) is 36,733,000 tonnes grading 0.58 g/t gold at a 0.2 g/t cut-off, containing 688,000 ounces of gold, with an effective date of August 8, 2025.

Dr. D.R. Webb, Ph.D., P.Geo., P.Eng. is the Q.P. for this release within the meaning of NI 43-101 and has reviewed the technical content of this release and has approved its content.

ON BEHALF OF THE BOARD OF DIRECTORS

________________________________________

Ian Klassen, President

For further information please contact:

GMV Minerals Inc.
Ian Klassen
Tel: (604) 899-0106
Email: [email protected]

Cautionary Statement Regarding Forward-Looking Information

This news release includes certain "forward-looking statements" under applicable Canadian securities legislation. Forward-looking statements include estimates and statements that describe the Company's future plans, objectives or goals, including words to the effect that the Company or management expects a stated condition or result to occur. Forward-looking statements may be identified by such terms as "believes", "anticipates", "expects", "estimates", "may", "could", "would", "will", or "plan". Forward-looking information contained in this news release include, but are not limited to, statements or information with respect to: the engagement of Machai, including the services to be provided and the grant of options to Machai, the anticipated drilling program on the Mexican Hat Project, including timing thereof, the results of the PEA, including the IRR and NPV, life of mine and production, capital expenditures, cost estimates; and the mine plan, future plans; mineral resources; and future gold prices. Since forward-looking statements are based on assumptions and address future events and conditions, by their very nature they involve inherent risks and uncertainties as described in the Company's filings with Canadian securities regulators. Assumptions upon which forward-looking information contained in this news release is based, without limitation, include: ability to obtain approval of the TSXV, the services to be provided by Machai, results of the drill program on the Mexican Hat Project and future exploration; gold prices; accuracy of the results of the PEA, including key assumptions and methods used to determine mineral resources and the results of the PEA; the ability to obtain required permits and approvals; the ability to execute future plans; exchange rates; ability to obtain funding; and changes in regulatory or community environment. Risks, and uncertainties include: results of further drilling and exploration; risks related to mineral tenure, permits and approvals; risks related to the execution of future plans; changes in gold price and exchange rates; risks related to obtaining financing; foreign country risks; regulatory risks and liabilities; and those risks and uncertainties as further described in the Company's filings with Canadian securities regulators which can be found on SEDAR+ at www.sedarplus.ca under the Company's profile. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

Cautionary Note to U.S. Investors

The United States Securities and Exchange Commission permits U.S. mining companies, in their filings with the SEC, to disclose only those mineral deposits that a company can economically and legally extract or produce. We use certain terms in this report, such as "Measured," "Indicated," "Inferred," and "Resources," that the SEC guidelines strictly prohibit U.S. registered companies from including in their filings with the SEC.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SOURCE: GMV Minerals, Inc.



View the original press release on ACCESS Newswire

(L.Kaufmann--BBZ)