Berliner Boersenzeitung - Camino Intercepts High-Grade Copper With 76.2m at 0.88% Cu Including 16.25m at 2.67% Cu and 6.82g/t Ag at Costa de Cobre in Peru; All Five Reported Drill Holes Intersect Strong Copper Mineralization

EUR -
AED 4.274598
AFN 75.646468
ALL 92.195436
AMD 423.131696
ANG 2.082935
AOA 1068.360574
ARS 1761.694611
AUD 1.611353
AWG 2.094825
AZN 1.973634
BAM 1.956105
BBD 2.342866
BDT 143.10664
BGN 1.974217
BHD 0.438807
BIF 3488.465461
BMD 1.163792
BND 1.471199
BOB 14.5699
BRL 5.938016
BSD 1.163182
BTN 110.69851
BWP 15.617176
BYN 3.562824
BYR 22810.316275
BZD 2.339596
CAD 1.60644
CDF 2688.358957
CHF 0.942153
CLF 0.02731
CLP 1078.333867
CNY 7.809682
CNH 7.805004
COP 3624.082102
CRC 528.707508
CUC 1.163792
CUP 30.840479
CVE 110.851144
CZK 24.261214
DJF 206.828683
DKK 7.475045
DOP 68.372542
DZD 154.74957
EGP 59.576125
ERN 17.456875
ETB 187.545654
FJD 2.553942
FKP 0.859406
GBP 0.858407
GEL 2.990031
GGP 0.859406
GHS 13.296327
GIP 0.859406
GMD 85.535907
GNF 10215.196927
GTQ 8.887387
GYD 243.379489
HKD 9.126634
HNL 31.247756
HRK 7.533923
HTG 152.130934
HUF 363.943257
IDR 20365.190026
ILS 3.515118
IMP 0.859406
INR 110.700385
IQD 1525.148953
IRR 1599718.902738
ISK 139.783802
JEP 0.859406
JMD 183.568652
JOD 0.825108
JPY 178.643183
KES 150.67642
KGS 101.773719
KHR 4718.011463
KMF 493.448022
KPW 1047.412824
KRW 1558.468659
KWD 0.359205
KYD 0.969397
KZT 528.712052
LAK 26048.558133
LBP 104217.541818
LKR 382.201001
LRD 203.401713
LSL 18.620803
LTL 3.436374
LVL 0.703966
LYD 7.367
MAD 10.915787
MDL 20.095086
MGA 5045.036399
MKD 61.529604
MMK 2443.309868
MNT 4187.659118
MOP 9.396391
MRU 46.632626
MUR 54.523437
MVR 17.980938
MWK 2021.505691
MXN 19.655974
MYR 4.735936
MZN 74.377651
NAD 18.620334
NGN 1541.022923
NIO 42.652836
NOK 10.696136
NPR 177.118015
NZD 1.991887
OMR 0.447481
PAB 1.163232
PEN 3.90394
PGK 5.177697
PHP 72.665405
PKR 322.549559
PLN 4.314228
PYG 6865.071513
QAR 4.242312
RON 5.25335
RSD 117.370705
RUB 99.009964
RWF 1711.937512
SAR 4.370675
SBD 9.303372
SCR 16.12033
SDG 700.017887
SEK 11.159406
SGD 1.471056
SHP 0.862214
SLE 28.630199
SLL 24404.128036
SOS 664.835188
SRD 43.916816
STD 24088.137401
STN 24.928417
SVC 10.178589
SYP 15131.618881
SZL 18.620352
THB 38.292226
TJS 10.742884
TMT 4.084909
TND 3.359286
TOP 2.802131
TRY 56.415272
TTD 7.898606
TWD 36.634418
TZS 3072.413492
UAH 51.969912
UGX 4402.687179
USD 1.163792
UYU 46.807306
UZS 13761.836656
VES 946.945201
VND 30150.350191
VUV 137.305538
WST 3.162497
XAF 656.096049
XAG 0.017156
XAU 0.000264
XCD 3.145205
XCG 2.096544
XDR 0.822861
XOF 656.96091
XPF 119.331742
YER 275.876922
ZAR 18.659945
ZMK 10475.519332
ZMW 22.392457
ZWL 374.740435
  • RYCEF

    -0.2900

    19.55

    -1.48%

  • NGG

    -0.6550

    77.405

    -0.85%

  • RBGPF

    -1.0000

    69

    -1.45%

  • RELX

    -0.4700

    34.23

    -1.37%

  • BTI

    -0.7350

    54.415

    -1.35%

  • GSK

    0.1100

    48.65

    +0.23%

  • RIO

    -0.1000

    103.73

    -0.1%

  • CMSD

    -0.1300

    20.55

    -0.63%

  • VOD

    -0.1800

    17.13

    -1.05%

  • BCC

    -0.6900

    76.17

    -0.91%

  • BCE

    -0.2850

    23.365

    -1.22%

  • JRI

    -0.0600

    12.14

    -0.49%

  • BP

    0.7500

    45.63

    +1.64%

  • CMSC

    -0.1850

    20.68

    -0.89%

  • AZN

    -2.8700

    157.17

    -1.83%

Camino Intercepts High-Grade Copper With 76.2m at 0.88% Cu Including 16.25m at 2.67% Cu and 6.82g/t Ag at Costa de Cobre in Peru; All Five Reported Drill Holes Intersect Strong Copper Mineralization
Camino Intercepts High-Grade Copper With 76.2m at 0.88% Cu Including 16.25m at 2.67% Cu and 6.82g/t Ag at Costa de Cobre in Peru; All Five Reported Drill Holes Intersect Strong Copper Mineralization

Camino Intercepts High-Grade Copper With 76.2m at 0.88% Cu Including 16.25m at 2.67% Cu and 6.82g/t Ag at Costa de Cobre in Peru; All Five Reported Drill Holes Intersect Strong Copper Mineralization

VANCOUVER, BC / ACCESS Newswire / June 10, 2026 / Camino Minerals Corporation (TSXV:COR)(OTCID:CAMZF) ("Camino" or the "Company") is pleased to announce the exploration results from Phase 2 of the recent drilling campaign at its Costa de Cobre project ("Costa de Cobre" or the "Project" (formerly known as "Los Chapitos"(1)) in Peru. Camino completed five drill holes along the Diva trend corridor, where drilling activities focused on the Adriana target with the objective of expanding the known mineralized body and improving the understanding of the scale and continuity of the mineralized system. The maximum drill hole depth was 260 metres and all five drill holes intercepted strong copper mineralization and spanned a strike length of approximately 400 metres.

Text size:

Key highlights of recent Costa de Cobre drill holes:

Adriana: DCH-131:

69.8 m @ 0.47% Cu & 4.17 g/t Ag, including

  • 32.0 m @ 0.75% Cu & 6.50 g/t Ag, and

9.75m @ 1.25% Cu & 6.46 g/t Ag, including

  • 3.90 m @ 2.99% Cu & 15.63 g/t Ag

Adriana DCH-132:

44.0 m @ 0.38% Cu & 1.87 g/t Ag, and

77.6 m @ 0.36% Cu & 1.63 g/t Ag, and

17.6 m @ 2.49% Cu & 12.58 g/t Ag

Adriana: DCH-133:

76.2 m @ 0.88% Cu & 2.03 g/t Ag, including

  • 16.25 m @ 2.67% Cu & 6.82 g/t Ag

Adriana: DCH-134:

53.8 m @ 0.77% Cu & 4.45 g/t Ag, including

  • 40.8 m @ 0.96% Cu & 5.43 g/t Ag

Adriana: DCH-135:

30.6 m @ 0.45% Cu & 2.38 g/t Ag, including

9.3 m @ 0.96% Cu & 6.12 g/t Ag

Costa de Cobre is Camino's second copper project with partner Nittetsu Mining Co, Ltd. ("Nittetsu"), who is completing a 35% earn-in interest in Costa de Cobre after investing CAD $10 million and after the completion of the current drilling campaign (see news release dated June 14, 2023). Camino is also advancing its Puquios Copper Project in Chile with Nittetsu Mining toward mine construction and development (see news release dated April 17, 2025. Construction is expected to commence in the summer, subject to securing project financing and an affirmative final investment decision.

The Costa de Cobre copper project offers growth potential through both resource expansion and new discoveries, supported by established infrastructure, strategic partnerships with Denham Capital and Nittetsu Mining, and exposure to the rapidly growing global copper market.

"These results continue to demonstrate good continuity and grades along the Diva trend at Adriana, with numerous additional high priority targets on the property including along the Diva, La Estancia and Atajo trends. Subject to further exploration of such high priority targets and the delineation of a mineral resource, we envision a copper mine that would be started around an expanded Adriana zone, and possibly connecting to feeder structures at depth, and include additional expanded zones of copper mineralization such as Lourdes located 1.4 km to the north, or Katty located 1 km to the south, and potential copper discoveries along the other La Estancia and Atajo trends. Costa de Cobre is located at low elevation along Peru's southern coast, close to major infrastructure, including the recently announced construction of the San Juan de Marcona port terminal, which will enhance future logistics and development in the region. Camino is now positioned with active growth initiatives in both Peru and Chile. With construction preparations advancing at Puquios and continued exploration programs planned in both Chile and Peru, we believe 2026 will be an active and transformative year for the Company as we build a leading copper development and exploration copper platform," said Jay Chmelauskas, CEO of Camino.

Nittetsu Mining's exploration manager, Yoshikazu Fujimoto stated, "Nittetsu has completed the three year earn-in at Costa de Cobre with these results continuing to demonstrate high-grade copper intercepts. Costa de Cobre hosts many discovery targets, and we have only drilled a fraction of the property's multiple copper trends. We now plan to advance the project to establish our joint venture with Camino, where Nittetsu will maintain a 35% Project interest."

"The integration of geological, structural, and drilling information has enhanced our ability to predict and target copper mineralization across Costa de Cobre. This work has not only contributed to recent drilling success but has also highlighted multiple opportunities to expand the mineralized footprint to unlock the broader district-scale potential of the project (Figure 1)," said Paulo Rodriguez and Jheferson Alcocer, geologists at Camino in Peru.

Geological Discussion

The recently completed 990.70 metres drilling program has increased total drilling at the Costa de Cobre Copper Project to 29,650 metres, further strengthening the Project's growing exploration database. Notably, approximately 91% of all historical drilling has been focused along the highly prospective Diva trend, extending approximately 7 km, underscoring the Company's strategic emphasis on this important copper corridor.

In addition to the Diva trend, other major structural corridors, such as La Estancia and Atajo, extending approximately 18 km and 8 km, respectively, remain significant, underexplored, and present compelling targets for future drilling campaigns.

Drilling in the vicinity of the Diva trend has expanded the mineralized footprint within the Adriana zone, highlighting the growth potential of the mineralized body. Five drill holes were completed along the highly prospective Adriana zone (holes DCH-131, DCH-132, DCH-133, DCH-134, and DCH-135) (Figure 2).

Figure 1. Map Showing the three copper corridors at Costa de Cobre project, Diva, La Estancia and Atajo trends.

Figure 2. Target location and holes drilled in the 2026 drilling campaign.

HOLE ID

EAST

NORTH

AZIMUTH

DIP

DEPTH (M)

FROM

TO

WIDTH (M)

GRADE (% Cu)

GRADE (g/t Ag)

AREA

DCH-131

574129.00

8266853.00

225.00

-50.00

188.80

7.40

20.20

12.80

0.57

6.93

Adriana

and

30.20

100.00

69.80

0.47

4.17

incl

45.50

77.50

32.00

0.75

6.50

and

107.70

127.50

19.80

0.41

2.32

and

132.00

139.50

7.50

0.30

3.09

and

159.45

169.20

9.75

1.25

6.46

incl

161.00

164.90

3.90

2.99

15.63

and

177.50

182.25

4.75

0.12

0.25

DCH-132

574205.00

8266841.00

225.00

-51.00

223.70

7.50

51.50

44.00

0.38

1.87

Adriana

and

64.50

80.00

15.50

0.20

0.98

and

96.50

174.10

77.60

0.36

1.63

and

188.60

207.30

18.70

2.35

11.85

incl

189.70

207.30

17.60

2.49

12.58

DCH-133

574317.50

8266664.00

225.00

-62.00

169.10

19.70

24.65

4.95

0.28

2.12

Adriana

and

89.50

165.70

76.20

0.88

2.03

incl

139.75

156.00

16.25

2.67

6.82

DCH-134

574386.00

8266570.00

217.00

-51.00

117.20

0.50

54.30

53.80

0.77

4.45

Adriana

incl

6.00

46.80

40.80

0.96

5.43

DCH-135

574129.00

8266853.00

225.00

-77.00

291.90

8.70

27.70

19.00

0.40

4.72

Adriana

incl

11.50

18.70

7.20

0.79

9.33

and

54.10

84.70

30.60

0.45

2.38

incl

66.50

75.80

9.30

0.96

6.12

and

90.45

96.00

5.55

0.38

0.79

and

109.50

118.50

9.00

0.40

2.26

and

138.90

141.00

2.10

0.83

1.55

and

151.50

157.40

5.90

0.32

1.05

and

185.95

189.00

3.05

0.27

0.57

and

251.30

267.60

16.30

0.30

0.44

incl

254.10

260.10

6.00

0.46

0.42

Notes: Datum for coordinates is WGS84 Zone 18S. Widths are not true widths

Table 1. Summary of the 2026-1 drilling campaign, Costa de Cobre Copper Project, Peru.

The project area within the Adriana zone is underlain by volcanic rocks of the Chocolate Formation, with pseudo-bedding displaying a strike of N250°-270° and a dip of 12°-30° to the NW. Up to three volcanic units have been identified, consisting of epiclastic sandstones, andesitic lavas, and lapilli tuffs, which are intruded by fine-grained monzodioritic hypabyssal bodies.

Mineralization is structurally controlled by the NW-SE-trending Diva fault, which traverses the drilled area and segments it into the East and West block domains. Copper mineralization is primarily hosted within the volcanic and hypabyssal rocks as breccias and mantos related to this structure. Near the surface, copper oxides are preferentially concentrated within the breccia matrix, partially penetrating the clasts along fractures and microfractures, whereas deeper zones are dominated by sulfides, specifically chalcopyrite and bornite.

Adriana Target

At the Adriana target, recent drilling has intersected significant copper and silver mineralization across multiple intervals. Drill hole DCH-131 returned several mineralized zones, highlighted by an upper intercept of 12.8 m @ 0.57% Cu & 6.93 g/t Ag, a broad zone of 69.8 m @ 0.47% Cu & 4.17 g/t Ag, and a high-grade deeper intercept of 3.90 m @ 2.99% Cu & 15.63 g/t Ag near the bottom of the hole. The system remains open at depth, indicating potential for further mineralization (Figure 3).

Drill hole DCH-132 also intersected substantial continuous mineralization, including a broad shallow interval of 44.0 m @ 0.38% Cu & 1.87 g/t Ag, another thick zone of 77.6 m @ 0.36% Cu & 1.63 g/t Ag, and a deeper high-grade intercept of 17.6 m @ 2.49% Cu & 12.58 g/t Ag (Figure 4).

Additionally, drill hole DCH-133 intercepted an upper interval of 4.95 m @ 0.28% Cu & 2.12 g/t Ag followed by a significant continuous zone of 76.2 m @ 0.88% Cu & 2.03 g/t Ag (Figure 5), while DCH-134 successfully encountered 53.8 m @ 0.77% Cu & 4.45 g/t Ag starting nearly from the surface (0.5 m) (Figure 6).

Notably, assay results for drill hole DCH-135 confirmed multiple stacked mineralized horizons throughout the entire hole, highlighted by an upper zone of 19 m @ 0.40% Cu & 4.72 g/t Ag, an intermediate interval of 9 m @ 0.40% Cu & 2.26 g/t Ag, and a deeper zone of 16.3 m @ 0.30% Cu & 0.44 g/t Ag. These recent intercepts continue to support the continuity of mineralization and indicate the potential for additional high-grade zones within the Adriana zone.

Figure 3. Cross section of copper mineralization at Adriana zone, drill holes DCH-131 and DCH-135.

Figure 4. Cross section of copper mineralization at Adriana zone, drill hole DCH-132.

Figure 5. Cross section of copper mineralization at Adriana zone, drill hole DCH-133.

Figure 6. Cross section of copper mineralization at Adriana zone, drill hole DCH-134.

The Costa de Cobre exploration and development program is designed to systematically unlock the value of a district-scale copper-silver system through resource expansion, new discoveries, and progressive de-risking of the asset.

Recent drilling supports the Company's geological model, indicating continuity of mineralization along the Diva Trend and suggesting that the system remains open both at depth and along strike. The next phases of exploration are focused on expanding known mineralized zones, testing multiple high-priority targets across the underexplored Diva, La Estancia, and Atajo structural corridors, and advancing the project toward resource delineation and future development milestones, with only a small portion of the prospective district and three copper corridors across the property systematically drill-tested to date.

Sampling and Assay Procedures

During this campaign, five drillholes were completed. Core has been logged and sampled at the Company's facilities in the town of Chala, 15 km from the project. Industry standard chain of custody and QA/QC practices are followed with samples sent to Lima where they are analyzed by ICP-MS at ALS Chemex Labs' facility, an independent laboratory. The Camino geological team complied with the written internal QA/QC procedures, where the insertion of blank samples, certified international standards (pulps) and duplicates, met the objectives and acceptable results.

(1)All previously disclosed technical and scientific information in respect of the Los Chapitos copper project remains applicable to the Costa de Cobre Project.

About Camino

Camino is a discovery and development stage copper exploration company. The Company has entered into a joint venture partnership with Nittetsu Mining Co., Ltd. to advance the construction-ready Puquios copper project in Chile toward development and production. Camino is advancing its IOCG Costa de Cobre copper project located in Peru through to resource delineation and development, and to add new discoveries. Camino has also permitted the Maria Cecilia copper porphyry project for exploration discovery drilling to add to its NI43-101 resources. In addition, Camino has increased its land position at its copper and silver Plata Dorada project. Camino seeks to acquire a portfolio of advanced copper assets that have the potential to deliver copper into an electrifying copper intensive global economy. For more information, please refer to Camino's website at www.caminocorp.com.

Jose A. Bassan, MSc. Geologist, an independent geologist FAusIMM (CP) 227922, a qualified person as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects, has reviewed and approved the technical contents of this document. Mr. Bassan has reviewed and verified relevant data supporting the technical disclosure, including sampling and analytical test data, with such verification including a review of assay certificates, QA/QC results, and drill logs.

ON BEHALF OF THE BOARD

For further information, please contact:

/S/ "Jay Chmelauskas"

Camino Investor Relations

President and CEO

[email protected]

Tel: (604) 493-2058

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.  

Cautionary Note Regarding Forward Looking Statements: Certain disclosures in this release constitute forward-looking information. In making the forward-looking disclosures in this release, the Company has applied certain factors and assumptions that are based on the Company's current beliefs as well as assumptions made by and information currently available to the Company. Forward-looking information in the release includes, without limitation, statements with respect to the prospectivity of future exploration work at Costa de Cobre, future planned drilling programs in Peru and Chile, the interpretation of geological models, the potential continuity and extent of mineralized systems, the continuation of drilling with future campaigns, and the prospectivity for copper exploration in new targets. Although the Company considers these assumptions to be reasonable based on information currently available to it, they may prove to be incorrect, and the forward-looking information in this release is subject to numerous risks, uncertainties and other factors that may cause future results to differ materially from those expressed or implied in such forward-looking information. Such risk factors include, among others, that actual results of the Company's exploration activities may be different than those anticipated by management; that geological interpretations, including the continuity or extent of mineralized bodies, may change with additional drilling; that the Company may not realize the benefits of joint ventures and/or strategic partnerships; that the Company may be unable to obtain or may experience delays in obtaining required permits, authorizations and approvals; operational and technical risks inherent in exploration; risks related to third‑party infrastructure development and timing, including the proposed San Juan de Marcona Port; and risks related to the state of equity and commodity markets. Readers are cautioned not to place undue reliance on forward-looking statements. The Company does not intend, and expressly disclaims any intention or obligation to, update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as required by law.

SOURCE: Camino Minerals Corp



View the original press release on ACCESS Newswire

(K.Müller--BBZ)